# Apply for or refresh access token

URL: https://docs.ones.cn/developer/openapi/api/apply-for-or-refresh-access-token

```
POST
## /oauth2/token

```

Apply for or refresh access token.

## History

| Version | Changes |
| --- | --- |
| v3.14.117, v3.15.26 | Added in: v3.14.117, v3.15.26 |

## Request

- application/x-www-form-urlencoded

### Body

**client_id** string The Client ID obtained from creating an OAuth application, which needs to be assigned when applying for or refreshing an access token.

**client_secret** string The Client Secret obtained from creating an OAuth application, which needs to be assigned when applying for an access token.

**code** string Authorization code, which needs to be assigned when applying for an access token.

**redirect_uri** string The Redirect URI configured when creating an OAuth application. It is not mandatory, but can be assigned when applying for an access token.

**grant_type** string **Possible values:** [ `authorization_code` , `refresh_token` ]

authorization_code,chosen when requesting an access token. refresh_token,chosen when refreshing an access token.

**refresh_token** string Refresh token, which needs to be assigned when refreshing an access token.

## Responses

- 200
- 400
- 401
- 500

Request successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**access_token** string The "Access token" (valid for 1 day).

**refresh_token** string The "Refresh token" used to refresh the access token (valid for 30 days).

**expires_in** integer The expiration time of the access token, measured in seconds.

**scope** string The Open API scopes that the OAuth application can access, separated by commas.

**token_type** string The type of access token.

**user_id** string The bot ID of the access token.

**email** string The bot email of the access token.

```json
{
  "access_token": "string",
  "refresh_token": "string",
  "expires_in": 0,
  "scope": "string",
  "token_type": "string",
  "user_id": "string",
  "email": "string"
}
```

Invalid request.

- application/json

- Schema
- Example (from schema)

**Schema

**

**error** string The error message for the current request.

**error_description** string The detailed error information for the current request.

**code** integer HTTP status code of the current response.

**errcode** integer Error code of the current response.

**type** string Error type of the current response.

**model** string Error module of the current response.

**field** string Error project of the current response.

**reason** string Error reason of the current response.

```json
{
  "error": "string",
  "error_description": "string",
  "code": 0,
  "errcode": 0,
  "type": "string",
  "model": "string",
  "field": "string",
  "reason": "string"
}
```

If the authentication credentials are incorrect or missing, it will return.

- application/json

- Schema
- Example (from schema)

**Schema

**

**error** string The error message for the current request.

**error_description** string The detailed error information for the current request.

**code** integer HTTP status code of the current response.

**errcode** integer Error code of the current response.

**type** string Error type of the current response.

**model** string Error module of the current response.

**field** string Error project of the current response.

**reason** string Error reason of the current response.

```json
{
  "error": "string",
  "error_description": "string",
  "code": 0,
  "errcode": 0,
  "type": "string",
  "model": "string",
  "field": "string",
  "reason": "string"
}
```

Internal server error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**error** string The error message for the current request.

**error_description** string The detailed error information for the current request.

**code** integer HTTP status code of the current response.

**errcode** integer Error code of the current response.

**type** string Error type of the current response.

**model** string Error module of the current response.

**field** string Error project of the current response.

**reason** string Error reason of the current response.

```json
{
  "error": "string",
  "error_description": "string",
  "code": 0,
  "errcode": 0,
  "type": "string",
  "model": "string",
  "field": "string",
  "reason": "string"
}
```
