# Execute ONESQL query

URL: https://docs.ones.cn/developer/openapi/api/execute-onesql

```
POST
## /onesql/query

```

## History

| Version | Changes |
| --- | --- |
| v6.88.0 | Added in: v6.88.0 |

## ONESQL Overview

- ONESQL is a structured query language for ONES work item data, with syntax similar to SQL, capable of expressing complex conditional logic.
- Statements consist of fields, operators, values/functions, combined through keywords like AND, OR, NOT; it's recommended to add parentheses for complex logic to ensure consistent results.
- Supports comparison of multiple field types including numeric, text, member, date, etc., and can combine time/member functions to generate dynamic conditions.
**Operator Reference**

| Type | Operators | Description | Examples |
| --- | --- | --- | --- |
| Comparison | `<``&lt;``>``>=``==``!=` | Compare between numeric/date/time/select/work item/member/text; `==` , `!=` only accept single values | `Due Date < "2008/12/31 09:00"``Assignee != currentUser()` |
| Set | `IN``NOT IN` | Whether field value exists in enumerated set, supports numeric/date/time/select/work item/member | `Priority IN (P0, P1)``Assignee NOT IN (John, Jane)` |
| Null | `IS``IS NOT` | Check if numeric/date/time/select/work item/member/file/text fields are empty | `Related Release IS EMPTY``Sprint IS NOT EMPTY` |
| Text Match | `~``!~` | Text field fuzzy contains or excludes specified string | `Title ~ "Project Management"``Description !~ "Closed"` |

**Common Functions**

| Scenario | Function | Parameters | Overview | Examples |
| --- | --- | --- | --- | --- |
| Time Point | `now(offset)` | `(+/-)nn(y/M/w/d/h/m)` , default `+` and day | Current time plus/minus offset | `Created Time > now(-1d)` |
| Start Time | `StartOfDay/Week/Month/Year(offset)` | Same as above, default units are day, week, month, year | Calculate start moment of corresponding time unit then offset | `Created Date > StartOfWeek(-1)` |
| End Time | `EndOfDay/Week/Month/Year(offset)` | Same as above | Calculate end moment of corresponding time unit then offset | `Due Date < EndOfMonth(+15d)` |
| Member Set | `DepartmentOf(names)` | Department name list | Return members of each department | `Assignee IN DepartmentOf(Product, Development)` |
| Member Set | `GroupOf(names)` | User group name list | Return members of each user group | `Assignee IN GroupOf(Testing)` |
| Member Set | `RolesOf(names)` | Role name list | Return members of each role | `Assignee IN RolesOf(CDT Team)` |
| Current User | `currentUser()` | None | Current logged-in user | `Assignee == currentUser()` |
| Hierarchy Property | `expand(values)` | Node value list | Expand single/multi-select cascade or module properties to child nodes | `Location IN expand(Jiangsu, Zhejiang)` |

**Keywords and Syntax Rules**

- Logic keywords: `AND` (and), `OR` (or), `NOT` (not), `EMPTY` (null check), case insensitive.
- Default priority is parentheses > `AND` > `OR` , recommend using parentheses for clear grouping.
- Text constants need quotes (single/double both work); time function parameters don't need quotes.
- Date fields support `yyyy/MM/dd HH:mm` , `yyyy-MM-dd HH:mm` , `yyyy/MM/dd` , `yyyy-MM-dd` formats; interval fields support `(+/-)XdYhZm` .
**Common Query Fragments**

- Current user's incomplete tasks: `uid(field004) == currentUser() AND uid(field_status) != uid('status_done_uuid')`
- Defects created last week: `uid(field_issue_type) == uid('defect_uuid') AND uid(field013) > StartOfWeek(-1) AND uid(field013) < StartOfWeek()`
- Specific department assignee: `uid(field004) IN DepartmentOf(uid('department_uuid'))`
- Due before 15th of next month: `uid(field010) < EndOfMonth(+15d)` (Example `field_status` , `field_issue_type` , `defect_uuid` etc. need to be replaced with actual field or option UUIDs.)
**OpenAPI Query Points**

- Execute statements through `POST /onesql/query` , need to explicitly specify data source (like `FROM issue` ), `LIMIT offset, size` , `ORDER BY` , `GROUP BY` clauses are consistent with standard ONESQL semantics.
- If your app manifest ( `plugin.yaml` / `opkx.json` ) declares ONESQL access, configure OAuth scope as `read:project:issue` ; otherwise upload may fail with OAuth validation errors.
- ONESQL provides more flexible custom field queries than `fieldValues` in `GET /openapi/v2/project/issues/{issueID}` .
- When accessing fields and sub-properties use `uid(fieldUUID[.subField])` , constant UUIDs written as `uid('xxx')` ; placeholders `$1` , `$2` etc. assigned in `variables` array.
- Pagination uses `v$cursor` comparison operations (like `v$cursor > ''` ) with `limit` ; set conditions can mix `currentUser()` , `DepartmentOf()` , `RolesOf()` and other functions.
**Query a specific issue field by field ID**

```sql
select uuid, uid(field_xxxxx) as target_field
from issue
where uid(uuid) in (uid('ISSUE_UUID'))
```

Replace `field_xxxxx` with the target field ID. For reference-type fields, specify sub-properties explicitly, e.g. `uid(field_xxxxx.uuid, field_xxxxx.name)` .

> Field IDs can be obtained from `GET /openapi/v2/project/searchIssueFields` . The older `GET /openapi/v2/project/issueFields` list is not complete.

**Common Virtual Fields (v$ prefix)**

| Field | Description | Deferred |
| --- | --- | --- |
| `v$path` | Returns hierarchy path, equals own UUID when hierarchy not enabled | No |
| `v$sub_workitem_count` | Current node's downstream count | No |
| `v$list_pin_field` | List pin information | No |
| `v$progress_editable` | Whether progress is editable | No |
| `v$has_view_manhour_tab` | Whether to show manhour tab | No |
| `v$sub_workitem_done_count` | Downstream completed count, depends on `v$path` | Yes |
| `v$issue_path` | Single work item complete path (including parent info) | No |

**OpenAPI Example**

```sql
select
  uid(uuid, uuid as path, field001 as summary,
      field007.uuid, field007.name,
      field005.name, field005.category,
      v$list_pin_field as list_pin_field,
      v$has_view_manhour_tab as has_manhour_tab,
      v$sub_workitem_count as downstream_task_count,
      v$sub_workitem_done_count as downstream_task_done_count)
from issue

where uid(3nfzBs64) in (uid('VU8KxHBr'))
  and uid(field004) in (currentUser())
  and v$cursor > ''
order by field009 desc

limit 1000, 50
```

## Request

### Query Parameters

**teamID** stringrequired The team ID

- application/json

### Body

**query** string ONESQL query, supports parameterization

**variables

** object[]

Parameterized variable value list

- Array [
oneOf

- MOD1
- MOD2
- MOD3
- MOD5
- MOD6

string

integer

boolean

object

number

- ]

**hierarchy

** object

Hierarchy relationship configuration

**lock_query** string

**perspective** boolean

**flat** boolean

**path

** object

**upstream_field** string

**downstream_field** string

**config

** object

**field** string

**tree** string

## Responses

- 200
- 401
- 403
- 404
- 500

Request successful

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object[]

required

- Array [
**type** Data type (string)

**item

** object

Returned when data type is item, key is property identifier, value is property value

**** object

**property name*

** IssuePropertyTypeSet

anyOf

- File
- Cascade property option
- Department
- Worklog record
- Work item
- Work item type
- User
- Project
- Sprint
- User group
- Related work item
- Script field option
- Product
- Product module
- Project module
- Remaining worklog record
- Work item status
- Status category
- Wiki page
- Option

**uuid** UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**team_uuid** Team UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**type** Attachment type (integer)

**name** File name (string)

**description** Description (string)

**status** Status (integer) **Possible values:** [ `1` , `2` , `3` , `[object Object]` , `[object Object]` , `[object Object]` ]

**field_uuid** Source property UUID (string)

**mime** File MIME type (string)

**owner_uuid** Uploader user UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**owner_name** Uploader username (string)

**size** File size (integer)

**create_time** Upload time (integer)

**uuid** UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**team_uuid** Team UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**field_uuid** Property UUID (string)

**parent_uuid** Parent option UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**children_count** Children count (integer)

**path** UUID path (string) From root node (including root node and current node) separated by -

**name** Option value (string)

**name_path** Option value path (string) From root node (including root node and current node) separated by /

**position** Sort position (integer)

**status** Status (integer) **Possible values:** [ `1` , `2` , `[object Object]` , `[object Object]` ]

**create_time** Create time (integer)

**update_time** Update time (integer)

**uuid** UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**org_uuid** Organization UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**team_uuid** Team UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**name** Name (string)

**name_pinyin** Name pinyin (string)

**leader** Direct superior user UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**status** Status (integer) **Possible values:** [ `1` , `2` , `[object Object]` , `[object Object]` ]

**uuid** UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**team_uuid** Team UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**task_uuid** LongUUID (string) **Possible values:**`>= 16 characters` and `<= 16 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{16}$`

**user_uuid** User UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**start_time** Start time (integer)

**hours** Hours (number)

**remark** Remark (string)

**status** Status (integer) **Possible values:** [ `1` , `2` , `[object Object]` , `[object Object]` ]

**create_time** Registration time (integer)

**type** Worklog type (integer) **Possible values:** [ `1` , `2` , `[object Object]` , `[object Object]` ]

**uuid** LongUUID (string) **Possible values:**`>= 16 characters` and `<= 16 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{16}$`

**name** Title (string)

**issue_type

** object

**uuid** UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**icon_uuid** Custom icon UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

File UUID

**icon** Standard icon enum (integer)

**name** Name (string)

**number** Work item ID (string)

**issue_type_uuid** Work item type UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**uuid** UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**team_uuid** Team UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**name** Name (string)

**name_pinyin** Name pinyin (string)

**icon** Standard icon enum (integer)

**icon_uuid** Custom icon UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

File UUID

**built_in** System work item type (boolean)

**create_time** Create time (integer)

**uuid** UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**name** Name (string)

**name_pinyin** Name pinyin (string)

**avatar** uri

**status** Status (integer) **Possible values:** [ `1` , `2` , `3` , `4` , `[object Object]` , `[object Object]` , `[object Object]` , `[object Object]` ]

**email** email

**title** Position (string)

**phone** Phone number (string)

**create_time** Create time (integer)

**type** User type (integer) **Possible values:** [ `1` , `[object Object]` ]

**uuid** LongUUID (string) **Possible values:**`>= 16 characters` and `<= 16 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{16}$`

**name** Name (string)

**name_pinyin** Name pinyin (string)

**status** Status (integer) **Possible values:** [ `1` , `2` , `[object Object]` , `[object Object]` ]

**is_archive** Is archived (boolean)

**icon** Icon (string)

**uuid** UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**project_uuid** LongUUID (string) **Possible values:**`>= 16 characters` and `<= 16 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{16}$`

**name** Name (string)

**name_pinyin** Name pinyin (string)

**description** Description (string)

**status** Status (integer) **Possible values:** [ `1` , `2` , `[object Object]` , `[object Object]` ]

**status_category** Status category (string) **Possible values:** [ `[object Object]` , `[object Object]` , `[object Object]` ]

**sprint_project_info

** object

**uuid** LongUUID (string) **Possible values:**`>= 16 characters` and `<= 16 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{16}$`

**name** Name (string)

**component_uuid** Component UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

UUID of the iteration component in the project that the iteration belongs to

**uuid** UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**team_uuid** Team UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**name** Name (string)

**name_pinyin** Name pinyin (string)

**desc** Description (string)

**status** Status (integer) **Possible values:** [ `1` , `2` , `[object Object]` , `[object Object]` ]

**create_time** Create time (integer)

**uuid** LongUUID (string) **Possible values:**`>= 16 characters` and `<= 16 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{16}$`

**name** Name (string)

**issue_type

** object

**uuid** UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**icon_uuid** Custom icon UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

File UUID

**icon** Standard icon enum (integer)

**name** Name (string)

**number** Work item ID (integer)

**status

** object

**uuid** UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**name** Name (string)

**category

** object

**** object

**project

** object

**uuid** UUID (string)

**name** Name (string)

**important_fields

** object[]

- Array [
**field_uuid** Property UUID (string)

**name** Property name (string)

**values** undefined[] Reference type property values are UUIDs of referenced objects

**reference_object** Reference object for reference type properties(See `IssuePropertyTypeSet`)

- ]

**view_permission** Has view permission (boolean)

**edit_related_permission** Has edit related permission (boolean)

**uuid** UUID (string)

**name** Name (string)

**uuid** UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**team_uuid** Team UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**name** Name (string)

**name_pinyin** Name pinyin (string)

**owner** Creator UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**assign** Assignee UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**create_time** Create time (string)

**status** Status (string)nullable **Possible values:** [ `1` , `null` , `[object Object]` , `[object Object]` ]

**uuid** UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**team_uuid** Team UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**product_uuid** Product UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**name** Name (string)

**name_pinyin** Name pinyin (string)

**path** UUID path (string) From root node, separated by -

**parent_uuid** Parent module UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**create_time** Create time (integer)

**update_time** Update time (integer)

**position** Sort position index (integer)

**status** Status (integer)nullable **Possible values:** [ `1` , `null` , `[object Object]` , `[object Object]` ]

**description** Description (string)

**uuid** UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**team_uuid** Team UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**project_uuid** LongUUID (string) **Possible values:**`>= 16 characters` and `<= 16 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{16}$`

**name** Name (string)

**path** UUID path (string) From root node, separated by -

**status** Status (integer) **Possible values:** [ `1` , `2` , `[object Object]` , `[object Object]` ]

**uuid** UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**task_uuid** LongUUID (string) **Possible values:**`>= 16 characters` and `<= 16 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{16}$`

**user_uuid** User UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**team_uuid** Team UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**hours** Remaining hours (integer)

**manual_deviation** Estimated deviation (integer)

**create_time** Create time (integer)

**status** Status (integer) **Possible values:** [ `1` , `2` , `[object Object]` , `[object Object]` ]

**uuid** UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**name** Name (string)

**name_pinyin** Name pinyin (string)

**category** Status category (string) **Possible values:** [ `[object Object]` , `[object Object]` , `[object Object]` ]

**built_in** Is system type (boolean)

**create_time** Create time (integer)

**status** Status (integer) **Possible values:** [ `1` , `2` , `[object Object]` , `[object Object]` ]

**uuid** Category enum (string) **Possible values:** [ `[object Object]` , `[object Object]` , `[object Object]` ]

**name** Name (string)

**uuid** UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**space_uuid** Page group UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**name** Page title (string)

**ref_type** Page type (integer) **Possible values:** [ `1` , `2` , `3` , `4` , `5` , `6` , `7` , `[object Object]` , `[object Object]` , `[object Object]` , `[object Object]` , `[object Object]` , `[object Object]` , `[object Object]` ]

**sub_ref_type** string Sub-type identifier

**ref_uuid** Content UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

Different page types have different meanings

**status** Status (integer) **Possible values:** [ `1` , `2` , `3` , `4` , `[object Object]` , `[object Object]` , `[object Object]` , `[object Object]` ]

**locked** Is locked (boolean)

**uuid** UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**field_uuid** Property UUID (string) **Possible values:**`>= 8 characters` and `<= 8 characters` , Value must match regular expression `^[1-9A-HJ-NP-Za-km-z]{8}$`

**name** Property value (string)

**value_pinyin** Property value pinyin (string)

**background_color** Background color (string)

**color** Text color (string)

**position** Sort position index (integer)

**desc** Description (string)

**status** Status (integer) **Possible values:** [ `1` , `2` , `[object Object]` , `[object Object]` ]

**aggregate

** object

Returned when data type is aggregate

**** object

**group_aggregate

** object[]

Returned when data type is group_aggregate

- Array [
**** object

- ]

**group

** object

Returned when data type is group

**key** string

**total** string

**info

** object

nullable

**** object

**property name*** anynullable

- ]

**page_info

** object

required

**has_next_page** boolean Whether there is a next page

**start_cursor** string Cursor of the first data item on current page

**end_cursor** string Cursor of the last data item on current page

**page_count** integer Number of items on current page

**total_count** integer Total number of data items in result set, accurate number when less than N, N when greater than N

**start_pos** integer Position index of the first data item on current page in result set

**end_pos** integer Position index of the last data item on current page in result set

```json
{
  "data": [
    {
      "type": "string",
      "item": {},
      "aggregate": {},
      "group_aggregate": [
        {}
      ],
      "group": {
        "key": "string",
        "total": "string",
        "info": {}
      }
    }
  ],
  "page_info": {
    "has_next_page": true,
    "start_cursor": "string",
    "end_cursor": "string",
    "page_count": 0,
    "total_count": 0,
    "start_pos": 0,
    "end_pos": 0
  }
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
