# Get field options

URL: https://docs.ones.cn/developer/openapi/api/get-field-options

```
POST
## /field/options

```

**Function Overview**

- Get option data for specified fields, supporting multiple field types (options, members, projects, etc.).
- Supports keyword search, UUID filtering, field selection and other functions.
- Different field types return different field structures, such as option types containing color information, member types containing avatars, etc.
**Common Usage**

- Get priority options: Returns option list containing `uuid` , `value` , `background_color` , `color`
- Get member list: Returns user information containing `uuid` , `name` , `avatar`
- Get project list: Returns project information containing `uuid` , `name` , `status`
**Example**

```json
{
  "field_uuid": "field012",
  "include_fields": ["uuid", "value", "background_color", "color"],
  "keyword": "",
  "limit": 100
}
```

## Request

### Query Parameters

**teamID** stringrequired The team ID

- application/json

### Body

**field_uuid** stringrequired Field UUID

**uuids** string[] Specify list of option UUIDs to return

**include_fields** string[] Specify list of fields to return

**keyword** string Keyword search

**limit** integer **Default value:**`20`

Return quantity limit

**offset** integer **Default value:**`0`

Offset

## Responses

- 200
- 401
- 403
- 404
- 500

Request successful

**Response Example**

```json
[
  {
    "uuid": "TcCM4kwC",
    "value": "Highest",
    "background_color": "#e63422",
    "color": "#FFFFFF"
  },
  {
    "uuid": "QA5U45FD",
    "value": "High",
    "background_color": "#ffe9e2",
    "color": "#ff6a39"
  },
  {
    "uuid": "BcDf5gHi",
    "value": "Medium",
    "background_color": "#ffd700",
    "color": "#000000"
  }
]
```

**Field Description**

- `uuid` : Unique identifier of the option
- `value` : Display name of the option
- `background_color` : Background color of the option (hexadecimal)
- `color` : Text color of the option (hexadecimal)
**Note** : Different field types may return different field structures. The above example is for option-type fields.

- application/json

- Schema
- Example (from schema)

**Schema

**

- Array [
**property name*** any Field option object, field structure varies by field type

- ]

```json
[
  {}
]
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
