# Get plugin driven options

URL: https://docs.ones.cn/developer/openapi/api/get-field-plugin-options

```
POST
## /field/plugin-options

```

**Function Overview**

- Retrieve dynamic option data generated by plugins for specific fields.
- Provide the plugin with contextual information (issue type, task, project, etc.) to return context-aware options.
- Support pagination when the option count is large.
**Example**

```json
{
  "field_uuid": "EGx9jsaH",
  "pagination": {
    "size": 50,
    "page": 1
  },
  "context": {
    "issue_type_uuid": "Cw2nMvjK",
    "task_uuid": "MM3animjQM6WJUdD",
    "project_uuid": "MM3animjuN9YpLGN"
  }
}
```

## Request

### Query Parameters

**teamID** stringrequired The team ID

- application/json

### Body

**field_uuid** stringrequired Field UUID

**pagination

** object

Pagination configuration

**size** integer **Default value:**`20`

Page size

**page** integer **Default value:**`1`

Page number

**context

** object

Context information passed to plugins

**issue_type_uuid** string Issue type UUID

**task_uuid** string Task UUID

**project_uuid** string Project UUID

## Responses

- 200
- 401
- 403
- 404
- 500

Request successful

**Response Example**

```json
{
  "result": "SUCCESS",
  "data": {
    "options": [
      {
        "uuid": "0000000N",
        "value": "No"
      },
      {
        "uuid": "0000000Y",
        "value": "Yes"
      }
    ],
    "page_result": null
  },
  "error_code": ""
}
```

**Field Description**

- `options` : Option list returned by the plugin
- `page_result` : Pagination result returned by the plugin (nullable)
- `result` : Request status, `SUCCESS` indicates success
- `error_code` : Error code when the request fails

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** stringrequired Request status

**data

** object

required

Response data returned by the plugin

**options** object[]required Option list returned by the plugin

**page_result

** object

nullable

Pagination metadata returned by the plugin

**property name*** anynullable Pagination metadata returned by the plugin

**error_code** stringrequired Error code when the request fails

```json
{
  "result": "string",
  "data": {
    "options": [
      {}
    ],
    "page_result": {}
  },
  "error_code": "string"
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
