# Get issue code associations

URL: https://docs.ones.cn/developer/openapi/api/get-issue-code-associations

```
GET
## /project/issues/:issueID/codeAssociations

```

Returns all commits, pull requests, and branches currently associated with an issue. Commits are ordered by `timestamp` , pull requests by `updateTime` , and branches by `createTime` , all in descending order. An association type with no data is returned as an empty array.

Pipeline runs nested under commits are subject to the pipeline browse permission. Runs that the caller cannot browse are omitted without hiding the commit or either of the other association types. This operation reads synchronized ONES data only and does not trigger synchronization with a source code platform.

## History

| Version | Changes |
| --- | --- |
| v6.100.39, v7.0.28, v7.27.0 | Added in: v6.100.39, v7.0.28, v7.27.0 |

## Request

### Path Parameters

**issueID** stringrequired UUID of the issue.

### Query Parameters

**teamID** stringrequired The team ID

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

required

**commits

** object[]

required

Commits ordered by timestamp in descending order.

- Array [
**uuid** stringrequired Commit UUID.

**hash** stringrequired Commit hash.

**message** stringrequired Commit message.

**author** stringrequired Commit author.

**branch** stringrequired Branch containing the commit.

**repo** stringrequired Repository name.

**scm** stringrequired Source code platform type.

**timestamp** int64required Commit time as Unix seconds.

**url** stringrequired URL of the commit on the source code platform.

**icon** stringrequired Source code platform or repository icon.

**devopsPipelineRun

** object[]

required

Pipeline runs visible to the caller.

- Array [
**uuid** string

**number** integer

**pipelineUUID** string

**repo** string

**branch** string

**status** string

**triggerBy** string

**triggerType** string

**startTime** int64

**finishTime** int64

**duration** integer

**log** string

**devopsPipeline

** object

**name** string

- ]

- ]

**pullRequests

** object[]

required

Pull requests ordered by updateTime in descending order.

- Array [
**key** stringrequired Internal object key.

**uuid** stringrequired Pull request UUID.

**number** integerrequired Pull request number in the repository.

**title** stringrequired

**state** stringrequired **Possible values:** [ `open` , `merged` , `closed` , `declined` ]

Synchronized pull request state.

**author** stringrequired

**fromBranch** stringrequired

**toBranch** stringrequired

**url** stringrequired

**reviewers** string[]required

**repo** stringrequired

**scmType** stringrequired

**updateTime** int64required Last update time as Unix seconds.

**createTime** int64required Creation time as Unix seconds.

**updateUser** stringrequired

**icon** stringrequired

- ]

**branches

** object[]

required

Branches ordered by createTime in descending order.

- Array [
**uuid** stringrequired Branch UUID.

**owner

** object

required

**name** string

**name** stringrequired

**url** stringrequired

**createTime** int64required Creation time as Unix seconds.

**repo** stringrequired

**scmType** stringrequired

**icon** stringrequired

- ]

**result** stringrequired The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
{
  "result": "SUCCESS",
  "data": {
    "commits": [],
    "pullRequests": [],
    "branches": []
  }
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
