# Get issue fields used in project detail forms

URL: https://docs.ones.cn/developer/openapi/api/get-issue-form-fields

```
POST
## /project/issueFormFields

```

Get field metadata for fields used by issue detail forms in a project.

## Notes

- `project_uuid` is required. Omit `issue_type_uuids` , or pass an empty array, to include all issue types in the project.
- When `issue_type_uuids` is provided, only issue types belonging to the project are included. Invalid entries are ignored when at least one entry is valid; if none are valid, the existing not-found error is returned.
- Fields from multiple detail forms are merged and deduplicated. Create forms, transition forms, hidden fields, and the issue number field are not included.
- The response `data` is the field array itself. This API does not support keyword search or pagination and does not guarantee detail-form display order.
- Field metadata has the same shape as items returned by `GET /openapi/v2/project/searchIssueFields` .

## Request

### Query Parameters

**teamID** stringrequired The team ID

- application/json

### Body

**required

**

**project_uuid** stringrequired Project UUID. The project must belong to the team specified by `teamID` .

**issue_type_uuids** string[] Optional issue type UUIDs used to limit the detail-form scope.

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object[]

Issue field metadata without search or pagination wrappers.

- Array [
**id** string Field ID.

**name** string Field name.

**aliases** string[] Field aliases.

**builtIn** boolean Whether the field is built in.

**required** boolean Whether the field is marked as required in the team field definition.

**createTime** integer Field creation timestamp in seconds.

**description** string Field description.

**fieldType** string Flat field type identifier.

**fieldTypeName** string Human-readable field type name.

**valueType** string Internal field value type identifier.

**referenceObjectType** string Referenced object type when the field stores reference values.

**readonly** boolean Whether the field is read-only.

**canBeFilter** boolean Whether the field can be used in filters.

**canBeSort** boolean Whether the field can be used in sorting.

**canBeGroup** boolean Whether the field can be used in grouping.

**setting

** object

nullable

Field setting JSON. Null when the field has no setting.

**property name*** anynullable Field setting JSON. Null when the field has no setting.

- ]

**result** stringrequired The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
{
  "result": "SUCCESS",
  "data": [
    {
      "id": "field012",
      "name": "Priority",
      "aliases": [
        "priority"
      ],
      "builtIn": true,
      "required": false,
      "createTime": 1715236973,
      "description": "",
      "fieldType": "priority",
      "fieldTypeName": "Priority",
      "valueType": "single_reference_object",
      "referenceObjectType": "priority",
      "readonly": false,
      "canBeFilter": true,
      "canBeSort": true,
      "canBeGroup": true,
      "setting": null
    }
  ]
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
