# Issue Code Association

URL: https://docs.ones.cn/developer/openapi/api/issue-code-association

Version: 2.0Read code associations that have been synchronized to ONES and linked to an issue.

## Authentication

- OAuth 2.0: oauth2

| Security Scheme Type: | oauth2 |
| OAuth Flow (authorizationCode): | Token URL: /oauth2/token<br>Authorization URL: /oauth2/authorize<br>Scopes:<br>- read:project:issue: Access issues |

[## 📄️Get issue code associations

Returns all commits, pull requests, and branches currently associated with an issue.](https://docs.ones.cn/developer/openapi/api/get-issue-code-associations/)
