# Issue Field

URL: https://docs.ones.cn/developer/openapi/api/issue-field

Version: 2.0This resource represents issue fields. Use it to get, create, update, and delete issue fields.

## Authentication

- OAuth 2.0: oauth2

| Security Scheme Type: | oauth2 |
| OAuth Flow (authorizationCode): | Token URL: /oauth2/token<br>Authorization URL: /oauth2/authorize<br>Scopes:<br>- read:project:issueField: Access issue field<br>- read:project:issueFieldGroup: Access issue field group |

[## 📄️Get a list of issue fields

Get a list of issue fields.](https://docs.ones.cn/developer/openapi/api/01-get-a-list-of-issue-fields/)
[## 📄️Search the complete issue field catalog

Get the complete searchable issue field catalog for the current team, including newer field types introduced in 6.88+.](https://docs.ones.cn/developer/openapi/api/search-issue-fields/)
[## 📄️Get issue fields used in project detail forms

Get field metadata for fields used by issue detail forms in a project.](https://docs.ones.cn/developer/openapi/api/get-issue-form-fields/)
[## 📄️Get a list of issue fields groups

Get a list of issue fields groups](https://docs.ones.cn/developer/openapi/api/02-get-a-list-of-issue-field-groups/)
[## 📄️Get a list of issue fields change log

Get a list of issue fields change log](https://docs.ones.cn/developer/openapi/api/03-get-a-list-of-issue-field-change-log/)
[## 📄️Query issue change logs

Query change logs from `issue_version`, grouped by issue and paged by issue.](https://docs.ones.cn/developer/openapi/api/query-issue-change-records/)
