# Query issue change logs

URL: https://docs.ones.cn/developer/openapi/api/query-issue-change-records

```
POST
## /project/issueFields/changeLog/query

```

Query change logs from `issue_version` , grouped by issue and paged by issue.

Key behavior:

- `create_time` and `update_time` filter issue fields, not `issue_version` fields.
- Pagination is based on `issue` ( `cursor + limit` ).
- `limit` defaults to `50` , max `1000` .
- Returned change records are capped at `10000` ; when capped, `records_truncated = true` .

## History

| Version | Changes |
| --- | --- |
| v6.104.0 | Added in: v6.104.0 |

## Request

### Query Parameters

**teamID** stringrequired The team ID

- application/json

### Body

**project_uuids** string[] Project UUIDs. Optional. Empty means all projects.

**issue_uuids** string[]required **Possible values:**`>= 1` , `<= 1000`

Issue UUIDs. Required. Provide at least 1 and at most 1000 issue UUIDs.

**field_uuids** string[] Field UUIDs. Optional. Empty means all changed fields.

**limit** integer **Possible values:**`>= 1` and `<= 1000`

Issue page size. Defaults to 50. Maximum 1000.

**cursor** string Issue pagination cursor. Use an empty string for the first page.

**create_time

** object

Millisecond timestamp range.

**start** int64 Inclusive start timestamp in milliseconds.

**end** int64 Inclusive end timestamp in milliseconds.

**update_time

** object

Millisecond timestamp range.

**start** int64 Inclusive start timestamp in milliseconds.

**end** int64 Inclusive end timestamp in milliseconds.

## Responses

- 200
- 401
- 403
- 404
- 500

Request successful

- application/json

- Schema
- Example (from schema)
- Example

**Schema

**

**data

** object

required

**records

** object[]

required

- Array [
**issue_uuid** string

**name** string Issue name.

**records

** object[]

- Array [
**version_uuid** string

**create_time** int64 Version creation time in milliseconds.

**field_uuid** string

**field_type** string

**field_name** string

**old_value

** object

nullable

oneOf

- MOD1
- MOD2
- MOD3
- MOD4
- MOD6

string

integer

number

boolean

object

**new_value

** object

nullable

oneOf

- MOD1
- MOD2
- MOD3
- MOD4
- MOD6

string

integer

number

boolean

object

**author

** object

nullable

**uuid** string

**name** string

- ]

**record_count** integer Count of change records for the issue.

- ]

**page_info

** object

**has_next_page** boolean Whether there is a next issue page.

**start_cursor** string Start cursor of the current issue page.

**end_cursor** string End cursor of the current issue page.

**page_count** integer Issue count in the current page.

**records_truncated** booleanrequired Whether records were truncated due to the 10000 record cap.

**record_count** integerrequired Total count of change records returned in this response.

```json
{
  "data": {
    "records": [
      {
        "issue_uuid": "string",
        "name": "string",
        "records": [
          {
            "version_uuid": "string",
            "create_time": 0,
            "field_uuid": "string",
            "field_type": "string",
            "field_name": "string",
            "old_value": "string",
            "new_value": "string",
            "author": {
              "uuid": "string",
              "name": "string"
            }
          }
        ],
        "record_count": 0
      }
    ],
    "page_info": {
      "has_next_page": true,
      "start_cursor": "string",
      "end_cursor": "string",
      "page_count": 0
    },
    "records_truncated": true,
    "record_count": 0
  }
}
```

```json
{
  "data": {
    "records": [
      {
        "issue_uuid": "CwQKxDfF",
        "name": "Updated issue title",
        "record_count": 2,
        "records": [
          {
            "version_uuid": "ver001",
            "create_time": 1737000000123,
            "field_uuid": "field001",
            "field_type": "text",
            "field_name": "Summary",
            "old_value": "Legacy summary",
            "new_value": "Updated summary",
            "author": {
              "uuid": "user001",
              "name": "Alice"
            }
          },
          {
            "version_uuid": "ver001",
            "create_time": 1737000000123,
            "field_uuid": "field005",
            "field_type": "status",
            "field_name": "Status",
            "old_value": "status_in_progress",
            "new_value": "status_done",
            "author": {
              "uuid": "user001",
              "name": "Alice"
            }
          }
        ]
      }
    ],
    "page_info": {
      "has_next_page": true,
      "start_cursor": "0",
      "end_cursor": "50",
      "page_count": 50
    },
    "records_truncated": false,
    "record_count": 2
  }
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
