# Retrieve AuthUserUUID by organization and user UUIDs

URL: https://docs.ones.cn/developer/openapi/api/retrieve-auth-user-uuid

```
POST
## /account/organization/:organizationUUID/auth_user_uuid

```

Retrieve the AuthUserUUID for a list of users within a specific organization.

## Request

### Path Parameters

**organizationUUID** stringrequired UUID of the organization

- application/json

### Body

**required

**

**users** string[] **Possible values:**`>= 1`

List of user UUIDs

## Responses

- 200
- 401
- 403
- 404
- 500

List of AuthUserUUIDs corresponding to the given user UUIDs

- application/json

- Schema
- Example (from schema)
- Example

**Schema

**

- Array [
**user_uuid** string Original user UUID

**auth_user_uuid** string Corresponding AuthUserUUID

- ]

```json
[
  {
    "user_uuid": "string",
    "auth_user_uuid": "string"
  }
]
```

```json
[
  {
    "user_uuid": "Jky1qMsA",
    "auth_user_uuid": "Jky1qMsA"
  }
]
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
