# Search the complete issue field catalog

URL: https://docs.ones.cn/developer/openapi/api/search-issue-fields

```
GET
## /project/searchIssueFields

```

Get the complete searchable issue field catalog for the current team, including newer field types introduced in 6.88+.

## History

| Version | Changes |
| --- | --- |
| v6.100.30, v7.0.17, v7.13.0 | Added in: v6.100.30, v7.0.17, v7.13.0 |

## Notes

- Returns static field metadata only.
- This API does not return `options` , `defaultValue` , or a nested `type` object.
- `keyword` filters by field name only. Empty `keyword` behaves the same as omitting it.
- To fetch candidate values for option or reference fields, use `GET /openapi/v3alpha/field/options` or `GET /openapi/v3alpha/field/plugin-options` .

## Request

### Query Parameters

**teamID** stringrequired The team ID

**limit** integer **Possible values:**`>= 1` and `<= 500`

**Default value:**`500`

Number of results to return. Defaults to 500. Maximum 500.

**cursor** string The starting location of this request

**keyword** string Optional keyword used to match field names.

## Responses

- 200
- 401
- 403
- 404
- 500

Request is successful.

- application/json

- Schema
- Example (from schema)

**Schema

**

**data

** object

**list

** object[]

List of issue fields.

- Array [
**id** string Field ID.

**name** string Field name.

**aliases** string[] Field aliases.

**builtIn** boolean Whether the field is built in.

**required** boolean Whether the field is marked as required in the team field definition.

**createTime** integer Field creation timestamp in seconds.

**description** string Field description.

**fieldType** string Flat field type identifier.

**fieldTypeName** string Human-readable field type name.

**valueType** string Internal field value type identifier.

**referenceObjectType** string Referenced object type when the field stores reference values.

**readonly** boolean Whether the field is read-only.

**canBeFilter** boolean Whether the field can be used in filters.

**canBeSort** boolean Whether the field can be used in sorting.

**canBeGroup** boolean Whether the field can be used in grouping.

**setting

** object

nullable

Field setting JSON. Null when the field has no setting.

**property name*** anynullable Field setting JSON. Null when the field has no setting.

- ]

**pageInfo

** object

Page information.

**count** integer The number returned this time.

**endCursor** string The last cursor on this page is generally used to turn pages.

**hasNextPage** boolean Is there a next page.

**startCursor** string The first cursor on this page is generally used to turn pages.

**totalCount** integer The total number of items available in the entire collection, including those that are returned in the current response.

**result** stringrequired The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

**errorData** object Error meta data for this request.

```json
{
  "result": "SUCCESS",
  "data": {
    "list": [
      {
        "id": "field012",
        "name": "Priority",
        "aliases": [
          "priority"
        ],
        "builtIn": true,
        "required": false,
        "createTime": 1715236973,
        "description": "",
        "fieldType": "priority",
        "fieldTypeName": "Priority",
        "valueType": "single_reference_object",
        "referenceObjectType": "priority",
        "readonly": false,
        "canBeFilter": true,
        "canBeSort": true,
        "canBeGroup": true,
        "setting": null
      },
      {
        "id": "field114",
        "name": "Region Cascade",
        "aliases": [],
        "builtIn": false,
        "required": false,
        "createTime": 1715237001,
        "description": "",
        "fieldType": "cascade_single_option",
        "fieldTypeName": "Single Cascade",
        "valueType": "single_reference_object",
        "referenceObjectType": "cascade",
        "readonly": false,
        "canBeFilter": true,
        "canBeSort": true,
        "canBeGroup": false,
        "setting": {
          "selectable_level": "leaf"
        }
      }
    ],
    "pageInfo": {
      "count": 2,
      "totalCount": 27,
      "startCursor": "0",
      "endCursor": "1",
      "hasNextPage": true
    }
  }
}
```

Returned if the authentication credentials are incorrect or missing.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Unauthorized",
  "errorMsg": "Access token is invalid"
}
```

Returns if the scope check fails.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Forbidden",
  "errorMsg": "Scope is invalid"
}
```

Returned if the resource object was not found.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "NotFound",
  "errorMsg": "Not Found"
}
```

Internal Server Error.

- application/json

- Schema
- Example (from schema)

**Schema

**

**result** string The result of this request.

**errorCode** string The error code of this request.

**errorMsg** string Error message for this request.

```json
{
  "result": "FAIL",
  "errorCode": "Internal Server Error",
  "errorMsg": "Internal Server Error"
}
```
