# Space

URL: https://docs.ones.cn/developer/openapi/api/space

Version: 2.0This resource represents spaces. Use it to get, create, update, and delete spaces.

## Authentication

- OAuth 2.0: oauth2

| Security Scheme Type: | oauth2 |
| OAuth Flow (authorizationCode): | Token URL: /oauth2/token<br>Authorization URL: /oauth2/authorize<br>Scopes:<br>- read:wiki:space: Access space information<br>- write:wiki:space: Create, update, and delete spaces |

[## 📄️Get team space list

## History](https://docs.ones.cn/developer/openapi/api/01-get-team-space-list/)
[## 📄️Create a space

## History](https://docs.ones.cn/developer/openapi/api/03-create-space/)
[## 📄️Get space detail by space ID

## History](https://docs.ones.cn/developer/openapi/api/02-get-space-detail/)
[## 📄️Update a space

## History](https://docs.ones.cn/developer/openapi/api/04-update-space/)
[## 📄️Delete a space

## History](https://docs.ones.cn/developer/openapi/api/05-delete-space/)
