# App Identity Delegation

URL: https://docs.ones.cn/developer/openapi/auth/app-identity-delegation

App Identity Delegation allows a ONES App to obtain an OpenAPI access token from installation context and call OpenAPI at runtime.

You can use it in two modes:

- **App identity** : the app calls OpenAPI as the installed app itself.
- **User identity** : the app calls OpenAPI on behalf of a specific user.
If the app declares `redirect_url` , it can also use the authorization code flow.

## OAuth capability in app configuration

Declare OAuth capability in `opkx.json` under `app.oauth` .

- `scope` : the scopes requested by the app. See [Scopes](https://docs.ones.cn/developer/openapi/auth/scope/) .
- `type` : `app` , `user` , or both. `app` enables app identity token exchange and `user` enables user identity token exchange.
- `redirect_url` : callback path for authorization code flow. It must start with `/` , for example `/oauth/callback` .
Example/opkx.json

```json
"app": {
  "oauth": {
    "scope": ["read:account:teams"],
    "type": ["user", "app"],
    "redirect_url": "/oauth/callback"
  }
}
```

Capability mapping:

- Declaring `type` enables token exchange through JWT Assertion.
- Declaring `redirect_url` enables authorization code flow.
- You can declare both and choose the flow based on the runtime scenario.

## Getting an access token

The identity semantics are the same across both flows:

- App identity: do not pass `userID` in SDK calls or `uid` in manual JWT claims.
- User identity: pass `userID` in SDK calls or `uid` in manual JWT claims.

## Method 1: JWT Assertion

Use this method when the app exchanges installation context for a token at runtime.

### Use the SDK

1. Save `installation_id` , `shared_secret` , and `ones_base_url` from the `install` callback.
2. Use the SDK at runtime to exchange installation information for an access token.
3. Call OpenAPI with `Authorization: Bearer <access_token>` .
Node SDK example:

```ts
import { oauth } from '@ones-open/node-sdk'

const accessToken = await oauth.getAccessTokenByInstallationInfo(installationInfo, userID)
```

- Omit `userID` to use app identity.
- Pass `userID` to use user identity.

### Build the JWT manually

JWT Assertion format:

`<Header>.<Claims>.<Signature>`

#### Header

Example/Header

```json
{
  "typ": "JWT",
  "alg": "HS256"
}
```

#### Claims

| Field Name | Type | Required | Description |
| --- | --- | --- | --- |
| `iss` | string | Yes | App installation ID |
| `sub` | string | Yes | App installation ID |
| `aud` | string | Yes | Fixed value: `oauth` |
| `iat` | int64 | Yes | Issued-at time in Unix seconds |
| `exp` | int64 | Yes | Expiration time in Unix seconds |
| `jti` | string | Yes | Unique JWT identifier |
| `uid` | string | No | ONES user ID. Omit it to use app identity |

信息
The `uid` field is optional. If it is omitted, the token is issued to the app itself.

Example/Claims

```json
{
  "iss": "{app_installation_id}",
  "sub": "{app_installation_id}",
  "aud": "oauth",
  "iat": 1714857600,
  "exp": 1714857605,
  "jti": "{jwt_unique_identifier}",
  "uid": "{ones_user_id}"
}
```

#### Signature

The signature is created with the installation `shared_secret` .

> The `shared_secret` returned by the install callback is base64 encoded. Decode it before signing.

Example/Signature

```text
signature = SignJWT(shared_secret, base64UrlEncode(header) + "." + base64UrlEncode(claims), "HS256")
```

Request example:

Example/Exchange Access Token

```bash
curl -X POST 'https://your-domain/oauth2/token' \
  -H 'Content-Type: application/x-www-form-urlencoded' \
  -d 'grant_type=urn:ietf:params:oauth:client-assertion-type:jwt-bearer' \
  -d 'assertion={JWT Assertion}'
```

Response example:

Example/Response

```json
{
  "access_token": "CN-xxx-install_xxx",
  "expires_in": 7200,
  "scope": "read:project:issue,read:project:project",
  "token_type": "Bearer",
  "user_id": "YTo7x4rY"
}
```

信息
This method does not generate a refresh token.

### Common JWT Assertion validation errors

When a JWT Assertion fails validation, the OAuth server may reject the token exchange request. Common checks and troubleshooting directions are listed below.

| Validation point | Typical issue | Troubleshooting |
| --- | --- | --- |
| `iss` / `sub` | Missing, inconsistent, or not using the app installation ID | Ensure both fields are present, use the same app installation ID, and do not use other identifiers |
| `aud` | Missing `oauth` audience | Ensure the JWT audience includes `oauth` |
| `iat` / `exp` | Missing, expired, `exp <= iat` , or the valid window is too long | Ensure both fields are present, `exp` is later than `iat` , and use a short validity window |
| Clock skew | `iat` appears to be in the future | Check the issuer machine clock and server clock for time skew |
| `jti` | Missing, reused, or malformed | Generate a unique `jti` for every assertion and avoid replaying the same assertion |
| Signature | Signature verification failed | Decode `shared_secret` from base64 before signing and use `HS256` |
| `uid` | User identity token exchange failed | Confirm the `uid` is a valid ONES user ID and that the app is expected to act on behalf of that user |

Recommended troubleshooting order:

1. Confirm `installation_id` and `shared_secret` come from the latest install callback.
2. Decode `shared_secret` from base64 before signing.
3. Verify `iss` , `sub` , `aud` , `iat` , `exp` , and `jti` one by one.
4. If you pass `uid` , confirm the user exists and belongs to the expected ONES context.
5. Generate a new assertion and retry instead of reusing an old one.

## Method 2: Authorization code flow

If the app declares `redirect_url` , it can also use the authorization code flow.

This is the ONES equivalent closest to a typical 3LO flow on other platforms:

1. Redirect the user to `/oauth2/authorize` .
2. Receive `code` on your `redirect_url` .
3. Exchange `code` for `access_token` at `/oauth2/token` .
Use authorization code flow when the app needs an explicit user-consent based access flow.

## Related docs

- [Authentication](https://docs.ones.cn/developer/openapi/authorization/)
- [Scopes](https://docs.ones.cn/developer/openapi/auth/scope/)
