# Status Codes

URL: https://docs.ones.cn/developer/openapi/status-code

The ONES REST API uses the [standard HTTP status codes](https://www.w3.org/Protocols/rfc2616/rfc2616-sec10.html) .

The response body of the error response is structured as follows:

```text
{
    "result":"xxx",
    "errorCode":"XXX",
    "errorMsg":"XXX",
}
```

- result：The result of the current request， SUCCESS | FAIL.
- errorCode：Error code.
- errorMsg：Error message.

| Error Code | Description |
| --- | --- |
| Unauthorized | Unauthorized、Invalid access token |
| Forbidden | Forbidden、Invalid scope |
| BadGateway | Gateway Service Error |
| Internal Server Error | Internal Server Error |
| InvalidParameter | Invalid parameters |
| NotFound | Resource Not Found、API Not Found |
| InvalidFileExt | Invalid file extension |
| ConstraintViolation | Constraint Violation |
