跳到主要内容

Entity Storage SDK

Prerequisites​

  • Before calling Entity Storage SDK, declare entity storage in your manifest first. See: Hosted App Storage.
  • Import @ones-open/node-sdk in backend and use storage:
  • For cross-language or direct HTTP integration, see: ONES Hosted API / Storage API.
src/index.ts
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

Constraints​

Create or Update an Entity Data​

Example usage:

src/index.ts
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee').set('employee001', {
name: 'Mike',
age: 25,
deleted: false,
})

Create or Update Entity Data Specification​

Entity data attribute types must satisfy the entity attribute definition in opkx.json.

  • If Key does not exist, create the entity data:
    • Required attribute, need to be provided.
    • Attributes that declare default values, if missing, the entity data will be created with the default values.
  • If Key exists, update the entity data:
    • Required attribute, need to be provided.
    • Attributes that declare default values, if missing, keep the original attribute value unchanged.

Batch Create or Update Entity Data​

BatchSet receive a set of data, some of which can be created and some updated. And each piece of data must meet the following requirements:

  • Key must satisfy the Entity Key specification.
  • Entity data must satisfy the Create or update entity data specification above.
  • In the same call, the entity data created in batches have the same creation timestamp.
  • When sorting by the creation timestamp of the data, the sorting results of the data with the same timestamp depend on the performance of the database.

Example usage:

src/index.ts
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee').batchSet([
{
key: 'employee888',
value: {
name: 'Emma',
age: 24,
deleted: true,
},
},
{
key: 'employee222',
value: {
name: 'Neo',
age: 28,
deleted: false,
},
},
{
key: 'employee999',
value: {
name: 'Molly',
age: 30,
deleted: false,
},
},
])

Delete an Entity Data​

Example usage:

src/index.ts
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee').delete('employee001')

Batch Delete Entity Data​

BatchDelete receive a set of data, and each piece of data must comply with:

Example usage:

src/index.ts
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee').batchDelete(['employee888', 'employee222'])

Get an Entity Data​

  • Key must satisfy the Entity Key specification.
  • If Key does not exist, undefined is returned and the SDK will not throw an error.

Example usage:

src/index.ts
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee')
.get('employee001')
.then((data) => {
console.log(data)
console.log(data?.name)
console.log(data?.age)
console.log(data?.deleted)
})

Return type:

src/index.ts
type data = {
name: string
age: number
deleted: boolean
}

Use Entity Query Object​

Entity query objects provide more query methods.

Example usage:

src/index.ts
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee').query()

Get an Entity Data by Entity Query Object​

  • If the entity does not have any data, undefined is returned and the SDK will not throw an error.

Example usage:

src/index.ts
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee')
.query()
.getOne()
.then((data) => {
console.log(data?.key)
console.log(data?.value)
console.log(data?.value.name)
console.log(data?.value.age)
console.log(data?.value.deleted)
})

Return type:

src/index.ts
type data = {
key: string
value: {
name: string
age: number
deleted: boolean
}
}

Get Entity Data Array by Entity Query Object​

  • If the entity does not have any data, an empty array is returned and the SDK does not throw an error.

Example usage:

src/index.ts
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee')
.query()
.getMany()
.then((data) => {
console.log(data.page_info.count)
console.log(data.page_info.has_more)
console.log(data.page_info.end_cursor)
console.log(data.data[0].key)
console.log(data.data[0].value)
})

Return type:

src/index.ts
type data = {
page_info: {
count: number
has_more: boolean
end_cursor: string
}
data: {
key: string
value: {
name: string
age: number
deleted: boolean
}
}[]
}

Get Entity Data Total Number by Entity Query Object​

Example usage:

src/index.ts
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee')
.query()
.count()
.then((data) => {
console.log(data)
})

Return type:

src/index.ts
type data = number

Set Entity Query Length (default: 10)​

The entity query object supports setting the entity query length.

Supported input range: [1, 1000].

Example usage:

src/index.ts
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee').query().limit(100).getMany()

Set Entity Query Sort (default: ASC)​

Entity query objects support setting entity query sorting.

You can only enter Sort, sort enumeration, and its enumeration values are:

  • ASC
  • DESC

In Custom index definition

  • When no index is defined:
    • Sort by the timestamp when the data was created.
  • When an index is defined:
    • Sort by the attribute value of the partition of the index and the timestamp when the data was created.
  • When sorting by the timestamp when the data was created, the sorting result of data with the same timestamp depends on the performance of the database.

Example usage:

src/index.ts
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity
const { Sort } = entity

entity('employee').query().sort(Sort.DESC).getMany()

Set Entity Query Cursor​

Entity query objects support setting entity query cursors.

Example usage:

src/index.ts
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

const query = entity('employee').query().limit(10)

query.getMany().then((data) => {
query
.cursor(data.page_info.end_cursor)
.getMany()
.then((data2) => {
console.log(data2)
})
})

Set Entity Query Index​

In Custom index definition, setting entity query indexes is supported only for entities that have indexes defined.

Example usage:

src/index.ts
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee').query().index('find_by_name')

entity('employee')
.query()
.index('find_by_age_in_deleted_partition', [false])
.getMany()
.then((data) => {
// Mike
// Neo
// Molly
})

Set Entity Query Where Condition​

Only entities with indexes defined in entity definitions can support setting entity query conditions.

In addition, entity query objects must first set entity query indexes before supporting setting entity query conditions.

You can only enter WhereConditions, entity query condition method enumeration, and its method enumeration values are:

  • beginsWith
  • between
  • equalTo
  • greaterThan
  • lessThan
  • greaterThanEqualTo
  • lessThanEqualTo
  • containsAny

Example usage:

src/index.ts
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity
const { WhereConditions } = entity

entity('employee')
.query()
.index('find_by_name')
.where(WhereConditions.beginsWith('M'))
.getMany()
.then((data) => {
// Mike
// Molly
})

entity('employee')
.query()
.index('find_by_age_in_deleted_partition', [true])
.where(WhereConditions.greaterThan(0))
.getMany()
.then((data) => {
// Emma
})

SDK Use Specification​

SDK Call Rule​

  • Write timeout: 15 seconds
  • Query timeout: 5 seconds
  • Maximum number of records returned in a single call: 1000

SDK Data Writing Specification​

Entity data specification

SDK Error Handling​

All entity operations are asynchronous.

For error handling of the following methods, please refer to the example usage:

  • set
  • batchSet
  • delete
  • batchDelete
  • get
  • getOne
  • getMany
  • count

Example usage:

src/index.ts
import { storage } from '@ones-open/node-sdk'
import type { EntityError } from '@ones-open/node-sdk'

const entity = storage.entity

entity('employee')
.query()
.getOne()
.then((data) => {
console.log(data)
})
.catch((error: EntityError) => {
console.log(error.code)
console.log(error.err_msg)
})

async function hello() {
try {
const data = await entity('employee').query().getOne()
console.log(data)
} catch (err: any) {
const error: EntityError = err
console.log(error.code)
console.log(error.err_msg)
}
}

Return type:

src/index.ts
type EntityError = {
code: string
err_msg: string
}

SDK Error Code​

Error codeDescription
EntityNameInvalidEntity name is empty. Or contains illegal characters. Or exceeds maximum length limit.
EntityNotFoundEntity name does not exist in configuration.
EntityDataEmptyEntity data cannot be empty.
EntityDataBatchLimitToo much entity data.
EntityDataKeyInvalidKey is empty. Or contains illegal characters. Or exceeds maximum length limit.
EntityDataKeyDuplicateDuplicate key is not allow.
EntityDataValueAttrInvalidAttribute name is empty. Or contains illegal characters. Or exceeds maximum length limit.
EntityDataValueAttrNotFoundAttribute name does not exist in configuration.
EntityDataValueEmptyValue cannot be empty.
EntityDataValueInvalidValue is illegal.
EntityDataStringValueTooLongThe value of the attribute of type string exceeds the maximum length limit.
EntityDataTextValueTooLongThe value of the attribute of type text exceeds the maximum length limit.
EntityDataAttrRequiredA required attribute is missing.
EntityDataValueTypeInvalidThe type of the attribute value does not match the defined type.
EntityDataIndexEmptyThe index cannot be empty.
EntityDataIndexNameInvalidThe index is empty. Or contains illegal characters. Or exceeds the maximum length limit.
EntityDataIndexNotFoundThe index does not exist in configuration.
EntityDataPartitionValueInvalidThe attribute value in the custom index is empty or illegal.
EntityDataPartitionValueTypeInvalidThe type of the attribute value in the custom index does not match the defined type.
EntityDataPartitionValueTooLongThe attribute value in the custom index exceeds the maximum length limit.
EntityDataUniqueConstraintFailedThe data has a unique constraint error.
EntityDataWhereConditionValueTypeInvalidThe attribute value type of the entity query condition clause does not match.
EntityDataWhereConditionValueTooLongThe attribute value of the entity query condition clause exceeds the maximum length limit.
EntityDataPageCursorInvalidThe value of the entity query cursor is illegal.
EntityDataSortValueInvalidThe value of the entity query sort is illegal.
EntityDataPageLimitNotInRangeThe value of the entity query paging length is illegal.
EntityDataAPITimeOutThe entity operation or query timed out.
MalformedJSONJSON serialization failed.