跳到主要内容

Getting Started

Overview​

With the ONES Open Platform, you can build your own application to connect from other systems with your own customizations, including appearance and behavior to meet your specific business requirements.

A ONES Open Platform application (called an App) is essentially a web application that can be integrated into ONES. This means you have full control over your technology stack and infrastructure, as well as the ability to implement your own security measures and authentication through your code.

Now let's start with a Hello World App in just a few minutes.

Install ONES CLI​

Init your development environment

curl -fsSL "https://docs.ones.cn/developer/quickstart.sh" | bash

Create your app​

  1. Navigate to the directory where you want to create the app.

  2. Create a new app.A new subdirectory with the app’s name will be created there.

ones create my-ones-app
  1. The app will be created in the directory.
  2. Change to the app subdirectory to see the app files:
cd my-ones-app

Overview of the app structure​

The app we created will display an setting page on the app's detail page when the app is installed in the ONES organization.

The hello world app has the following structure:

my-ones-app/
├── backend
│ ├── app.controller.ts
│ ├── app.module.ts
│ ├── app.service.ts
│ └── main.ts
├── eslint.config.mjs
├── nest-cli.json
├── opkx.json
├── package-lock.json
├── package.json
├── public
│ ├── favicon.ico
│ └── logo.svg
├── tsconfig.build.json
├── tsconfig.json
└── vite.config.ts

Let's take a look at the important files in the app's structure:

  • opkx.json: The app's manifest file.
  • package.json: The app's npm (node package manager) package file.
  • tsconfig.json: The TypeScript configuration file.
  • nest-cli.json: The NestJS configuration file for app's backend.
  • vite.config.ts: The Vite configuration file for app's frontend.

Change the app name​

Edit the app's opkx.json file to change the app name to "App for <your name>".

For example, App for Jack.

{
"app": {
// Your app id should be generated by the CLI, it start with `app_` and be 20 characters long.
"name": "App for Jack"
}
}
备注

Save the file and exit. If the app name contains spaces, that will be generated a opkx file with spaces in the name. We recommend using hyphens instead of spaces.


Build and package​

Navigate to the app's top level directory, and use ones build to build the app and package the app into a .opkx file.

ones build

The built app will be generated a <app-name>.opkx file in the app's top level directory.


Install your app in ONES​

Note: Check you have the permission to install apps in your ONES organization.

  1. Navigate to the ONES On-Premises instance and find the App Center on the left sidebar.
  2. Click the App Center to go to the Installed apps page.
  3. Click the Upload App button and select the <app-name>.opkx file which is generated in the previous step.
  4. Click the Confirm button to install the app.
  5. The app will be installed and you can see it in the Installed apps page.
提示

View your app in ONES​

Click the app to see the detail info. App Detail Info


Next Step​

In the next tutorial, you will learn about: