跳到主要内容

App Lifecycle

Overview​

The ONES Open Platform application lifecycle management system provides a comprehensive framework for managing app installation, configuration, and operation. This ensures secure and controlled deployment of applications within ONES organizations through standardized callback mechanisms and JWT-based authentication.

Lifecycle States​

App-Lifecycle

Applications in the ONES platform go through the following lifecycle state transformations:

  1. Install: App is deployed and integrated with the organization
  2. Enable: App becomes active and operational, all capabilities are available
  3. Disable: App is temporarily deactivated but remains installed, all capabilities are unavailable
  4. Uninstall: App is completely removed from the organization

Lifecycle Callback Configuration​

Manifest Declaration​

The lifecycle_callback configuration is part of your app's own manifest (app metadata and behavior), not runtime-only platform settings.

Use different manifest sections based on the hosting model:

Hosting ModelConfig Filelifecycle_callback Location
ONES hostedopkx.jsonapp.lifecycle_callback
Externally hostedmanifest.jsonTop-level lifecycle_callback

For ONES hosted apps, configure callbacks in opkx.json under the app section: See more details: Hosted App

opkx.json
{
"app": {
"lifecycle_callback": {
"install": "/install_cb",
"enabled": "/enabled_cb",
"disabled": "/disabled_cb",
"uninstalled": "/uninstalled_cb"
}
}
}

Callback Fields​

Note The install callback affects the app installation process in ONES, while other callbacks do not impact the lifecycle status.

Field NameRequiredTypeDescription
installYesstringInstallation callback URL
enabledNostringEnablement callback URL
disabledNostringDisablement callback URL
uninstalledNostringUninstallation callback URL

URL Requirements​

  • All callback URLs must be relative paths starting with /
  • Maximum length: 256 characters
  • Must be accessible endpoints within your application
  • Should implement proper error handling and validation

HTTP Headers​

The following headers will be included in the HTTP callbacks from ONES:

HeaderRequiredDescriptionExample
Content-TypeYesRequest body formatapplication/json
X-Ones-Trace-IdYesRequest tracing ID for debugging32c430a06a8411ef9f0cbfe18ab3b83a
AuthorizationNoJWT for authenticationBearer eyJhbGciOiJIUzI1NiIsInR5cCI6IkpXVCJ9...
Authorization Header
  • Installation callback: Authorization header is empty (not present)
  • Other callbacks (enabled/disabled/uninstalled): Authorization header from ONES contains a JWT for authentication. You should verify the JWT using the shared secret for security

Authorization Header Format:

Authorization: Bearer <JWT_TOKEN>

Installation Callback​

The installation callback is triggered when an app is first installed in an organization. This is the most critical callback as it establishes the secure communication channel between your app and ONES.

Callback Trigger Scenarios​

The installation callback is triggered in the following scenarios:

important

In all scenarios below, a new shared secret will be generated and provided to your app.

ScenarioDescription
First InstallationFirst time installing the app in an organization.
Manual/Auto UpdateWhen the app version changes from the current installation record. For Externally hosted apps, updating the app's manifest URL also triggers this scenario. If the app installation status is enabled, ONES will trigger both the installation and enabled callbacks.

Example Request Body:

{
"installation_id": "install_123e4567e89b12d3a456426614174000",
"org_id": "DPbJ77Xr",
"ones_base_url": "https://ones.example.com",
"shared_secret": "YTMyYzQzMGEwNmE4NDExZWY5ZjBjYmZlMThhYjNiODM=",
"callback_type": "install",
"time_stamp": 1718868300000,
"app": {
"id": "app_k8m2x7n9p5w3z1q6",
"version": "v1.0.4"
}
}

Request Structure​

Field NameTypeRequiredDescription
installation_idstringYesApp installation ID (generated by ONES)
org_idstringYesONES organization ID
ones_base_urlstringNoONES instance base URL
shared_secretstringYesJWT signing secret (base64 encoded, 32 bytes)
callback_typestringYesCallback type, always "install"
time_stampnumberYesUnix timestamp (milliseconds)
app.idstringYesApp ID for this request
app.versionstringYesApp version for this request

Response Requirements​

important

Your installation endpoint MUST return HTTP status code 200 to complete the installation successfully.

Installation Callback Failure Handling​

The installation callback uses a simple retry strategy, which is critical for the installation process:

  • Timeout: 10 seconds per request
  • Retry Attempts: 1 additional retry (total of 2 attempts)
  • Failure Impact: The above attempts are unsuccessful

Retryable Conditions (Will Retry)​

  • Network Timeouts: Connection or request timeout (>10 seconds)
  • HTTP 429: Too Many Requests (rate limiting)
  • HTTP 5xx: All server errors (500-599)

Non-Retryable Conditions (Permanent Failure)​

  • HTTP 2xx: Success responses (process completes without retry)
  • HTTP 4xx: Client errors (400-499, except 429), including:
    • 400 Bad Request
    • 401 Unauthorized
    • 403 Forbidden
    • 404 Not Found
    • 422 Unprocessable Entity
    • Other 4xx errors

Implementation Example​

app.post('/install_cb', (req, res) => {
const {
installation_id,
org_id,
ones_base_url,
shared_secret,
callback_type,
time_stamp,
app
} = req.body;

// Store the shared_secret securely for JWT verification
await storeAppCredentials({
installationId: installation_id,
orgId: org_id,
sharedSecret: shared_secret,
onesBaseUrl: ones_base_url
});

// Initialize app data for this organization
await initializeAppData({
installationId: installation_id,
orgId: org_id,
appId: app.id,
appVersion: app.version
});

res.status(200).json({
message: 'App installed successfully'
});
});
Important Implementation Requirements
  • Secure Secret Storage: The shared_secret must be stored securely as it's required for JWT verification
  • Proper Error Handling: Return appropriate HTTP error responses if installation fails
  • Comprehensive Logging: Log installation events for monitoring and debugging purposes

Enable/Disable/Uninstall Callbacks​

These callbacks are triggered when an app's lifecycle state changes. And will NOT affect the overall application lifecycle process in ONES. Even if your callback fails or returns an error, the app's state change will still proceed successfully.

Request Structure​

Field NameTypeRequiredDescription
installation_idstringYesApp installation ID
callback_typestringYesCallback type: "enabled", "disabled", or "uninstalled"
time_stampnumberYesUnix timestamp (milliseconds)
app.idstringYesApp ID from app manifest (manifest.json or opkx.json app section)
app.versionstringYesApp version from app manifest (manifest.json or opkx.json app section)

Example Request Body:

{
"installation_id": "install_123e4567e89b12d3a456426614174000",
"callback_type": "enabled",
"time_stamp": 1718868300000,
"app": {
"id": "app_k8m2x7n9p5w3z1q6",
"version": "v1.0.4"
}
}

Response Requirements​

信息

These callback endpoints should return HTTP status code 200 or 204 to indicate successful processing.

Callback Retry Rules​

For retryable conditions, ONES uses exponential backoff:

Note: Unlike the the simple retry strategy used by the installation callback, this exponential backoff is designed for general retryable conditions, providing more flexibility with increasing delays.

  • Initial delay: 3 seconds
  • Multiplier: 3x (3s → 9s → 27s → 60s → 60s...)
  • Maximum interval: 60 seconds
  • Total retry time: 300 seconds (5 minutes)

Simple Implementation Example​

enabled_cb.js
app.post('/enabled_cb', (req, res) => {
const { installation_id, app, callback_type, time_stamp } = req.body;

// Activate app services for this installation
await enableAppServices(installation_id);

// Resume any scheduled tasks or background processes
await resumeScheduledTasks(installation_id);

res.status(200).json({
message: 'App enabled successfully'
});
});
disabled_cb.js
app.post('/disabled_cb', (req, res) => {
const { installation_id, app, callback_type, time_stamp } = req.body;

// Temporarily disable app services
await disableAppServices(installation_id);

// Pause scheduled tasks but preserve data
await pauseScheduledTasks(installation_id);

res.status(200).json({
message: 'App disabled successfully'
});
});
uninstalled_cb.js
app.post('/uninstalled_cb', (req, res) => {
const { installation_id, app, callback_type, time_stamp } = req.body;

// Clean up app data (consider data retention policies)
await cleanupAppData(installation_id);

// Remove stored credentials
await removeAppCredentials(installation_id);

// Cancel any active subscriptions or services
await cancelActiveServices(installation_id);

res.status(200).json({
message: 'App uninstalled successfully'
});
});

Handling Out-of-Order Callbacks​

Different callbacks to your app may arrive out of order.

With poor network conditions or frequent lifecycle operations, for example, when an admin enables an app:

  1. ONES sends an enabled callback to your app
  2. Due to network issues or slow app processing, the enabled callback fails and will be retried
  3. Admin clicks "Disable" at this time, ONES sends a disabled callback
  4. Your app may receive multiple callback types in this sequence:
    • enabled (first request, network delay, but eventually arrives)
    • disabled (succeeds)
    • enabled (ONES retry for the failed first request, but app is now disabled)

Important: The time_stamp in the enabled request will be earlier than the disabled request.

You can choose between two strategies to handle duplicate and out-of-order callbacks:

  1. Timestamp-based filtering: Discard callbacks with older timestamps than your current state
  2. Idempotency: Design callbacks to be safe to execute multiple times

Strategy 1: Timestamp-Based Filtering​

Discard callbacks with timestamps older than your current state:

timestamp_filtering.js
app.post('/enabled_cb', async (req, res) => {
const { installation_id, callback_type, time_stamp } = req.body

// Get current app state
const currentState = await getAppState(installation_id)

// Discard outdated callbacks
if (currentState && time_stamp <= currentState.last_updated) {
console.log(`Discarding outdated ${callback_type} callback`)
return res.status(200).json({ message: 'Callback discarded (outdated)' })
}

// Update state with new timestamp
await updateAppState(installation_id, {
status: callback_type,
last_updated: time_stamp,
})

// Perform state change
await enableAppServices(installation_id)

res.status(200).json({ message: 'App enabled successfully' })
})

Strategy 2: Idempotency​

Design callbacks to be safe to execute multiple times:

idempotent_callbacks.js
app.post('/enabled_cb', async (req, res) => {
const { installation_id, callback_type, time_stamp } = req.body

// Always safe to call - check current state and act accordingly
const currentState = await getAppState(installation_id)

if (currentState?.status === 'enabled') {
// Already enabled, nothing to do
return res.status(200).json({ message: 'App already enabled' })
}

// Enable services (idempotent operation)
await enableAppServices(installation_id)
await updateAppState(installation_id, {
status: 'enabled',
last_updated: time_stamp,
})

res.status(200).json({ message: 'App enabled successfully' })
})

Security Considerations​

  • Store shared_secret values using encryption at rest (see Token Storage and Management)
  • Use secure key management systems in production
  • Never log secret values in plain text

Troubleshooting​

Common Issues​

  1. Callback Timeouts: Ensure callbacks complete within 10 seconds
  2. Secret Storage Failures: Verify database connectivity and permissions
  3. JWT Verification Errors: Make sure you had decoded the shared_secret before using it for verifying the JWT
  4. Duplicate Installations: Implement proper idempotency checks

Debug Tips​

  1. Enable detailed logging for all lifecycle events
  2. Validate request payloads against expected schemas
  3. Test callback endpoints independently using tools like Postman
  4. Monitor callback response times and error rates