跳到主要内容

Hosted App Storage

Overview​

Hosted App Storage provides unified persistence capabilities for hosted apps, including:

  • Entity Storage: read/write/query for structured business data.
  • Object Storage: upload/download for files and attachments.

Quick Start​

1. Configure storage declarations in manifest​

Add ones.storage to your hosted app opkx.json:

opkx.json
{
"app": { ... },
"runtime": { ... },
"ones": {
"storage": {
"object": true,
"entities": [
{
"name": "employee",
"attributes": {
"name": {
"type": "string",
"length": 64,
"required": true
},
"age": {
"type": "integer",
"required": true
},
"department": {
"type": "string",
"length": 64,
"default": ""
}
},
"indexes": [
{
"name": "idx_name",
"range_attribute": "name"
}
]
}
]
}
}
}
Note
  • Put declarations under ones.storage.
  • To enable Object Storage, you must explicitly set ones.storage.object: true.

2. Import @ones-open/node-sdk in backend and use storage​

backend/storage/index.ts
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity
const object = storage.object

3. Use Entity Storage​

1) Write data​

backend/storage/index.ts
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

await entity('employee').set('employee_001', {
name: 'Alice',
age: 30,
department: 'Engineering',
})

2) Read data​

backend/storage/index.ts
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

const employee = await entity('employee').get('employee_001')
console.log(employee?.name, employee?.department)

3) Query by index​

backend/storage/index.ts
import { storage } from '@ones-open/node-sdk'

const entity = storage.entity

const list = await entity('employee').query().index('idx_name').getMany()

console.log(list.data.length)

4. Use Object Storage​

1) Get upload pre-sign parameters​

backend/storage/index.ts
import { storage } from '@ones-open/node-sdk'
import type { ObjectStoreUploadResult } from '@ones-open/node-sdk'

const object = storage.object

const upload = (await object.upload('task-attachment')) as ObjectStoreUploadResult
const url = upload.getWebUrl()
const fields = upload.getFields()

2) Get download URL​

backend/storage/index.ts
import { storage } from '@ones-open/node-sdk'
import type { ObjectStoreDownloadResult } from '@ones-open/node-sdk'

const object = storage.object

const download = (await object.download('task-attachment')) as ObjectStoreDownloadResult
const url = download.getWebUrl()
console.log(url)

Manifest Declarations​

Entity Storage​

Declaration format​

opkx.json
{
"ones": {
"storage": {
"entities": [
{
"name": "<entity1>",
"attributes": {
"<attribute1>": {
"type": "<type>",
"required": true
},
"<attribute2>": {
"type": "<type>",
"default": "<value>"
},
"<attributeN>": {
"type": "<type>",
"default": "<value>"
}
},
"indexes": [
{
"name": "<index1>",
"range_attribute": "<attribute_name>"
},
{
"name": "<indexN>",
"range_attribute": "<attribute_name>",
"partition": ["<attribute_name>"]
}
]
},
{
"name": "<entity2>"
},
{
"name": "<entityN>"
}
]
}
}
}

Field definitions​

FieldTypeRequiredDescription
ones.storage.entities[]entityYesEntity configuration array. See entity.
entity​
FieldTypeRequiredDescription
namestringYesEntity name.
attributesmap[string]attributeYesAttribute definitions. Key is attribute name. See attribute.
indexes[]indexNoIndex definitions. See indexes.
attribute​
FieldTypeRequiredDescription
typestringYesSupports boolean / integer / float / string / text.
requiredbooleanNoWhether required.
defaultanyNoDefault value; cannot be used together with required: true.
lengthintegerConditionally requiredRequired when type=string; range [1, 2048].
attribute.type​
ValueIndexableNeeds lengthNotes
booleanYesNotrue / false
integerYesNo(-9223372036854775808, 9223372036854775807]
floatYesNoUp to 15 significant digits
stringYesYes ([1, 2048])Suitable for queryable fields
textNoNoLong text (max 32768 bytes per attribute)
indexes​
FieldTypeRequiredDescription
namestringYesIndex name.
range_attributestringYesMust reference an existing attribute.
partitionstring[]NoPartition attribute array.
uniquebooleanNoUnique constraint flag.
Note

range_attribute and partition can only reference indexable attribute types (boolean / integer / float / string).

Constraints​

Entity Key​
TypeConstraint
Entity KeyMax 64 bytes and matches /^[_a-z0-9]{1,64}$/
Attributes and indexes​
  • string requires length; text is not indexable.
  • Required attributes: required: true; value must be provided on write.
  • Default value attributes: use default; cannot be combined with required: true.
  • Default value length for string/text must be ≤ 64 bytes.
  • Index rules:
    • range_attribute must reference an existing attribute in attributes.
    • range_attribute type must be one of boolean / integer / float / string.
    • partition and unique are optional; unique enforces uniqueness on range_attribute + partition.
Quantity and naming limits​
ItemLimit
Number of entitiesMax 64
Entity nameMax 32 bytes, regex /^[_a-z0-9]{1,32}$/
Attributes per entityMax 32
Attribute nameMax 64 bytes, regex /^[_a-z0-9]{1,64}$/
Number of indexesMax 64
Index nameMax 64 bytes, regex /^[_a-z0-9]{1,64}$/

Object Storage​

Declaration format​

opkx.json
{
"ones": {
"storage": {
"object": true
}
}
}

Constraints​

Object Key​

Max 128 bytes and matches /^[0-9a-zA-Z!_.*'()-]{1,128}$/. Recommended to follow the S3 object key specification.

File size​

Recommended file size: up to 1 GB.

Signature validity​

Pre-signed URL is valid for 1 hour; request a new one after expiry.

Next Steps​