跳到主要内容

App Security

The ONES Open Platform implements a comprehensive security framework to protect applications and data through multiple layers of security controls. This framework ensures secure communication, proper authentication, and robust authorization mechanisms for all app interactions.

Security Architecture​

The ONES platform security model consists of three primary layers:

Communication Security​

HTTPS Requirements​

All communication between ONES platform and applications must use HTTPS for production environments.

Protocol Configuration​

EnvironmentProtocolCertificateValidation
ProductionHTTPSValid SSLRequired
DevelopmentHTTPSelf-signedOptional

Implementation Example​

// Configure HTTPS for production
if (process.env.NODE_ENV === 'production') {
const https = require('https')
const fs = require('fs')

const options = {
key: fs.readFileSync('private-key.pem'),
cert: fs.readFileSync('certificate.pem'),
}

https.createServer(options, app).listen(443)
} else {
app.listen(3000)
}

Certificate Management​

Production Requirements​

  1. Valid SSL Certificate: Use certificates issued by trusted Certificate Authorities
  2. Certificate Chain: Include complete certificate chain in configuration
  3. Renewal Process: Implement automated certificate renewal
  4. Security Headers: Configure proper security headers
// Security headers configuration
app.use((req, res, next) => {
res.setHeader('Strict-Transport-Security', 'max-age=31536000; includeSubDomains')
res.setHeader('X-Content-Type-Options', 'nosniff')
res.setHeader('X-Frame-Options', 'DENY')
res.setHeader('X-XSS-Protection', '1; mode=block')
next()
})

JWT Authentication​

JWT tokens provide signed proof that a callback truly comes from ONES and carries untampered request context; without validation, attackers could spoof requests or relay stale payloads into your app.

ONES issues JWTs for lifecycle callbacks (enabled, disabled, uninstalled), event webhooks, and capability extensions such as manhour validators—any integration surface where ONES pushes data into your service.

Token Structure​

JWT Format: <Header>.<Claims>.<Signature>

JWT Claims Description​

FieldTypeRequiredDescription
iatint64YesIssued at time - Unix timestamp when the token was generated
expint64YesExpiration time - Unix timestamp when token expires (max 300 seconds for callbacks, 1 day for others)
audstringYesAudience - App ID as defined in the app manifest
substringYesSubject - App installation ID for this specific installation
issstringNoONES base URL - The base address ONES provides for app access. May be empty if not applicable. If empty, use the default base URL provided by the ONES platform or contact the administrator for assistance.
uidstringNoUser ID - ONES user ID when the token represents a real user context
rshstringNoRequest string hash - Hash of request parameters to prevent tampering
Request string hash (rsh)

The rsh field contains a hash of the request method, path, and query parameters to ensure request integrity. ONES generates this hash when making callback requests, and apps can verify it to enhance security against request tampering. See Request String Hash section below for detailed implementation.

Example/Token Structure
Header: {
"alg": "HS256",
"typ": "JWT"
}

Claims: {
"iat": 1735680000, // Issued at timestamp (Unix seconds)
"exp": 1735680300, // Expiration timestamp (max 300 seconds for callbacks, 1 day for others)
"aud": "string", // App ID from manifest
"sub": "string", // App installation ID
"iss": "string", // ONES base URL
"uid": "string", // ONES user ID (optional, for user context)
"rsh": "string" // Request string hash (optional, for request integrity)
}

Token Verification​

Use the shared_secret from the installation callback to verify incoming JWTs.

important

The shared_secret is base64 encoded in the callback. The app should decode it before using it for verifying the JWT.

Simple Token Verification Example​

const jwt = require('jsonwebtoken')

function simpleVerifyToken(token, installationId) {
// Get shared secret for this installation
const sharedSecret = getStoredSecret(installationId)

// Decode base64 encoded secret
const decodedSecret = Buffer.from(sharedSecret, 'base64')

// Verify and decode token
const decoded = jwt.verify(token, decodedSecret)

return decoded
}

// Usage in callback endpoint
app.post('/enabled_cb', (req, res) => {
const token = req.get('Authorization')?.replace('Bearer ', '')
const { installation_id } = req.body

try {
const claims = simpleVerifyToken(token, installation_id)
console.log('Token verified for installation:', claims.sub)

// Process your callback logic here
res.status(200).json({ status: 'success' })
} catch (error) {
console.error('Token verification failed:', error.message)
res.status(401).json({ error: 'Unauthorized' })
}
})

Production-Ready Token Verification​

For production environments, use comprehensive validation with security checks:

const crypto = require('crypto')

function verifyToken(token, installationId, req) {
try {
// Step 1: Retrieve shared_secret for this app instance
const sharedSecret = getStoredSecret(installationId)
if (!sharedSecret) {
throw new Error('Shared secret not found for installation')
}

// Step 2: Decode base64 encoded shared secret
const decodedSecret = Buffer.from(sharedSecret, 'base64')

// Step 3: Verify token signature and decode claims
const decoded = jwt.verify(token, decodedSecret, {
algorithms: ['HS256'], // Only allow HMAC SHA256
clockTolerance: 5, // Allow 5 seconds clock skew
})

// Step 4: Validate required claims
validateClaims(decoded, installationId, req)

return decoded
} catch (error) {
console.error('JWT verification failed:', error.message)
throw new Error(`Token verification failed: ${error.message}`)
}
}

function validateClaims(claims, expectedInstallationId, req) {
const now = Math.floor(Date.now() / 1000)

// Check required fields
if (!claims.iat) {
throw new Error('Missing issued at time (iat)')
}
if (!claims.exp) {
throw new Error('Missing expiration time (exp)')
}
if (!claims.aud) {
throw new Error('Missing audience (aud)')
}
if (!claims.sub) {
throw new Error('Missing subject (sub)')
}

// Validate installation ID matches
if (claims.sub !== expectedInstallationId) {
throw new Error('Installation ID mismatch')
}

// Validate audience (should be your app ID)
if (claims.aud !== process.env.APP_ID) {
throw new Error('Invalid audience')
}

// Validate token timing (additional check beyond jwt.verify)
if (claims.iat > now + 5) {
throw new Error('Token issued in the future')
}

if (claims.exp < now - 5) {
throw new Error('Token expired')
}

// Validate token lifetime (callbacks should have max 300 seconds)
const tokenLifetime = claims.exp - claims.iat
if (tokenLifetime > 300) {
throw new Error('Token lifetime too long for callback')
}

// Validate optional request string hash
if (claims.rsh) {
if (!req) {
throw new Error('Request context required for RSH validation')
}

const method = req.method.toUpperCase()
const path = req.path
const queryString = new URLSearchParams(req.query).toString()
const signaturePayload = `${method}:${path}:${queryString}`
const computedHash = crypto.createHash('sha256').update(signaturePayload).digest('hex')

if (computedHash !== claims.rsh) {
throw new Error('Request string hash mismatch')
}
}
}

// Enhanced usage example with error handling
function handleCallbackWithAuth(req, res) {
try {
const authHeader = req.get('Authorization')
if (!authHeader) {
return res.status(401).json({
error: 'Missing Authorization header',
})
}

// Remove Bearer prefix
const token = authHeader.replace(/^Bearer\s+/, '')
if (!token) {
return res.status(401).json({
error: 'Invalid Authorization header format',
})
}

// Extract installation ID from request body for validation
const { installation_id } = req.body
if (!installation_id) {
return res.status(400).json({
error: 'Missing installation_id in request body',
})
}

// Verify JWT
const claims = verifyToken(token, installation_id, req)

console.log('Token verified successfully:', {
installationId: claims.sub,
audience: claims.aud,
tokenLifetime: claims.exp - claims.iat,
})

// Add claims to request for use in route handler
req.jwt = claims
req.installationId = claims.sub

// Continue with callback processing
processCallback(req, res)
} catch (error) {
console.error('Callback authentication failed:', error.message)

// Return appropriate error status
if (error.message.includes('expired')) {
return res.status(401).json({ error: 'Token expired' })
} else if (error.message.includes('signature')) {
return res.status(401).json({ error: 'Invalid token signature' })
} else {
return res.status(401).json({ error: 'Authentication failed' })
}
}
}

function processCallback(req, res) {
// Your callback logic here
res.status(200).json({ status: 'success' })
}

Token Storage and Management​

Secure Secret Storage​

const crypto = require('crypto')

// Encrypt secrets at rest
function encryptSecret(secret, encryptionKey) {
const cipher = crypto.createCipher('aes-256-gcm', encryptionKey)
let encrypted = cipher.update(secret, 'utf8', 'hex')
encrypted += cipher.final('hex')
const tag = cipher.getAuthTag().toString('hex')
return `${encrypted}:${tag}`
}

function decryptSecret(encryptedSecret, encryptionKey) {
const [encrypted, tag] = encryptedSecret.split(':')
const decipher = crypto.createDecipher('aes-256-gcm', encryptionKey)
decipher.setAuthTag(Buffer.from(tag, 'hex'))
let decrypted = decipher.update(encrypted, 'hex', 'utf8')
decrypted += decipher.final('utf8')
return decrypted
}

Frontend Security​

CORS Configuration​

Architecture Overview​

ONES uses a micro-frontend architecture for frontend extensions, with the data flow: ONES Frontend to Application. This approach was chosen after comprehensive evaluation of performance, security, implementation cost, and stability factors:

  • Micro-frontend Framework: ONES has established frontend sandbox and event mechanisms, achieving isolation between application frontend and standard product frontend
  • Cross-domain Solution: Independent application deployment inevitably faces cross-domain issues, and CORS is a universal solution
  • High Trust Level: App installation is initiated by organization administrators, making applications highly trusted programs
  • Security Assurance: ONES to Application communication includes Authorization header to support application verification of request legitimacy, providing basic security guarantee

Backend CORS Setup​

Each HTTP request from the browser (ONES Frontend) to the server (App Backend) must be allowed by CORS. This can be done by setting the Access-Control-Allow-Origin header in the response.

const cors = require('cors')

// Configure CORS in your app backend
const corsOptions = {
origin: function (origin, callback) {
// Allow ONES domains
const allowedOrigins = [
'https://ones.example.com',
// Allow that origin which ONES organization is installed your app in ONES instance.
]

if (
!origin ||
allowedOrigins.some((allowed) => {
if (typeof allowed === 'string') return allowed === origin
return allowed.test(origin)
})
) {
callback(null, true)
} else {
callback(new Error('Not allowed by CORS'))
}
},
credentials: true,
optionsSuccessStatus: 200,
}

app.use(cors(corsOptions))

Frontend CORS Handling​

For frontend requests, prefer using the Web SDK helper which handles authentication and context automatically. See ONES.fetchApp for usage details and examples.

import { ONES } from '@ones-open/web-sdk'

ONES.fetchApp('/app/metadata')

Content Security Policy​

// Set comprehensive CSP headers
app.use((req, res, next) => {
res.setHeader(
'Content-Security-Policy',
[
"default-src 'self'",
"script-src 'self' 'unsafe-inline' https://ones.example.com",
"style-src 'self' 'unsafe-inline' https://fonts.googleapis.com",
"font-src 'self' https://fonts.gstatic.com",
"img-src 'self' data: https:",
"connect-src 'self' https://api.ones.example.com",
"frame-ancestors 'none'",
"base-uri 'self'",
"form-action 'self'",
].join('; '),
)

next()
})

Runtime Information Security (Browser)​

To protect organization and user data, the runtime environment of frontend extensions applies strict information security restrictions while running in the browser sandbox.

Global Object Isolation​

The window and document objects are proxy objects that provide controlled access to browser APIs. Additionally, window.parent and window.top both point to the current window itself, ensuring isolation from the parent frame context.

Relative Path Handling​

When making API calls, all relative paths are resolved using the sandbox's HTML address as the baseURI:

// Network request APIs
fetch(url, options) // URL will be rewritten as absolute path based on baseURI
navigator.sendBeacon(url, data) // URL will be rewritten as absolute path based on baseURI
new XMLHttpRequest().open(method, url) // URL will be rewritten as absolute path based on baseURI
new EventSource(url) // URL will be rewritten as absolute path based on baseURI

// Image resources
img.src = url

When requesting resources (including dynamically created resources), all relative paths are resolved using the sandbox's HTML address as the baseURI:

<!-- HTML resource references -->
<link href="style.css" rel="stylesheet" />
<script src="script.js"></script>
<img src="image.png" />
<video src="video.mp4"></video>
@font-face {
src: url('font.woff2');
}

All relative paths are resolved based on the sandbox's baseURI.

DOM Node Tree Isolation​

The DOM node tree is isolated within the sandbox container with property overrides and query redirection:

Property Overrides

// Document structure points to sandbox container
document.documentElement // Returns sandbox's html element
document.head // Returns sandbox's head element
document.body // Returns sandbox's body element
document.activeElement // Returns sandbox's body element
document.scrollingElement // Returns sandbox's body element

Node Element Query Isolation

// Query methods redirected to sandbox container
document.querySelector(selector) // Queries within sandbox container
document.querySelectorAll(selector) // Queries within sandbox container
document.getElementsByTagName(tag) // Queries within sandbox container
document.getElementsByTagNameNS(ns, tag) // Queries within sandbox container
document.getElementById(id) // Queries within sandbox container
document.getElementsByName(name) // Queries within sandbox container

Node Element Relationship Isolation

node.parentNode // If sandbox html, returns sandbox's document object
node.parentElement // If sandbox html, returns null
node.offsetParent // Returns sandbox element, sandbox's body, or null

Style Isolation​

All CSS styles, whether from network requests, HTML style tags, or dynamically created style tags, are automatically scoped to the sandbox to prevent affecting the host's styles:

<!-- Network-requested CSS files -->
<link href="style.css" rel="stylesheet" />

<!-- HTML style tags -->
<style>
.my-class {
color: red;
}
</style>
// Dynamically created style tags
const style = document.createElement('style')
style.innerHTML = '.my-class { color: blue; }'

All styles are automatically scoped for isolation.

ONES Data Isolation​

To ensure ONES data isolation:

IndexedDB API Scoping

The IndexedDB API is scoped to prevent access to ONES data.

Storage Access Restrictions

// These storage APIs are disabled and cannot read or write data
localStorage // Cannot read or write
sessionStorage // Cannot read or write
document.cookie // Cannot read or write
window.name // Cannot read or write

ONES Environment Isolation​

To ensure ONES environment isolation, the sandbox cannot access or manipulate the location and history objects:

// These APIs are restricted and cannot modified
location // Cannot modify
history // Cannot modify

Troubleshooting Security Issues​

Common Security Problems​

  1. Token Verification Failures

    • Check shared secret encoding (base64)
    • Verify token expiration handling
    • Validate audience and issuer claims
  2. CORS Rejections

    • Verify origin domain configuration
    • Check preflight request handling
    • Confirm credential settings
  3. Certificate Issues

    • Validate certificate chain
    • Check certificate expiration
    • Verify domain name matching

Debugging Tools​

// Security debugging middleware
function securityDebugger(req, res, next) {
if (process.env.NODE_ENV === 'development') {
console.log('Security Debug:', {
method: req.method,
url: req.url,
origin: req.get('Origin'),
authorization: req.get('Authorization') ? 'Present' : 'Missing',
contentType: req.get('Content-Type'),
})
}
next()
}

app.use(securityDebugger)

Request String Hash​

Request String Hash (RSH) is a mechanism for verifying the integrity of HTTP requests between ONES and your app. When a request passes through intermediary services, compute the request hash for tamper-proof transit.

Why We Need RSH​

  • JWT signs only the claims: It guarantees integrity for the token payload (sub, aud, etc.), but not for the HTTP method, path, or query parameters that can still be manipulated in transit.
  • RSH binds request-line details: By hashing the method, URI, and query string, RSH ensures the request that arrives is exactly the one ONES issued—even if proxies rewrite URLs or inject parameters.
  • Prevents replay and route swapping: Attackers cannot reuse a valid JWT against a different endpoint or with altered filters because the hashed request context must match.
  • Layered defense: JWT authenticates who sent the request; RSH safeguards what was sent. Together they provide end-to-end assurance of authenticity and integrity.

When to Use RSH​

RSH is especially valuable in the following scenarios:

  • Lifecycle callbacks: Validate that ONES lifecycle callback payloads have not been modified by proxies or middleware before they reach your service.
  • Event webhooks: Confirm that event notifications delivered through the ONES event system arrive unchanged, even when routed through intermediate relays.
  • Capability extensions: Safeguard capability-specific callbacks (for example, manhour validators or other extension points) against tampering with targeted resource identifiers.

RSH Generation Algorithm​

The RSH generation process transforms the Method, URI, and Query parameters from the request:

1. Process HTTP Method​

Convert the HTTP method to uppercase:

const method = req.method.toUpperCase()

2. Process URI​

Process the URI with the following rules:

  • Use the relative path from the base URL, must start with '/'
  • If the URI contains '&', it will be escaped as %26
let uri = req.uri
// Ensure URI starts with '/'
if (!uri.startsWith('/')) {
uri = '/' + uri
}
// Escape & symbols
uri = uri.replace(/&/g, '%26')

3. Process Query Parameters​

Process query parameters with these rules:

  • URL encode both parameter keys and values (skip if key is 'jwt')
  • Join encoded key and value with '='
  • Sort by parameter key first (if a key has multiple values, sort the values as well)
  • Join all parameters with ',' comma
const queryParts = []

for (const [key, val] of Object.entries(req.query)) {
// Skip jwt parameter
if (key === 'jwt') {
continue
}

const escapedKey = encodeURIComponent(key)

// Handle single or multiple values
let values
if (Array.isArray(val)) {
values = val
} else {
values = [val]
}

// Sort multiple values for the same key
values.sort()

for (const value of values) {
const escapedValue = encodeURIComponent(value)
queryParts.push(`${escapedKey}=${escapedValue}`)
}
}

// Sort parameters by key
queryParts.sort()
const query = queryParts.join(',')

4. Build Request Context (req_context)​

Concatenate the three processed components using '&':

const reqContext = `${method}&${uri}&${query}`

5. Calculate SHA256 Hash​

Compute the SHA256 hash of the request context and convert to hexadecimal string:

import crypto from 'crypto';

const hash = crypto.createHash('sha256').update(reqContext).digest('hex');
return hash;

RSH Validation Process​

On the server side, RSH validation is included in the JWT verification flow:

1. JWT Verification​

First verify the JWT in the request:

const authHeader = req.headers['authorization']
if (!authHeader || !authHeader.startsWith('Bearer ')) {
throw new Error('Missing or invalid Authorization header')
}
const tokenStr = authHeader.replace('Bearer ', '')
const claims = verifyJWT(tokenStr, sharedSecret)

2. RSH Validation​

If the JWT claims contain an rsh field, perform RSH validation:

if (claims.rsh && claims.rsh !== '') {
const expectedRSH = computeRSH(req)
if (!expectedRSH) {
throw new Error('RSH compute error')
}
if (claims.rsh !== expectedRSH) {
throw new Error('RSH mismatch')
}
}

3. RSH Computation Implementation​

Server-side RSH computation implementation:

import crypto from 'crypto'
import { URL } from 'url'

function computeRSH(req) {
const method = req.method.toUpperCase()
const urlObj = new URL(req.url, `http://${req.headers.host}`)
let uri = urlObj.pathname

// Handle & symbols in URI
uri = uri.replace(/&/g, '%26')

// Process Query parameters
const queryParts = []
for (const [key, values] of urlObj.searchParams.entries()) {
if (key === 'jwt') {
continue // Skip jwt parameter
}

const escapedKey = encodeURIComponent(key)
const valueArray = Array.isArray(values) ? values : [values]
valueArray.sort() // Sort multiple values

for (const value of valueArray) {
const escapedVal = encodeURIComponent(value)
queryParts.push(`${escapedKey}=${escapedVal}`)
}
}

queryParts.sort() // Sort parameters
const queryStr = queryParts.join(',')

// Concatenate request context
const reqContext = `${method}&${uri}&${queryStr}`

// Calculate SHA256
const hash = crypto.createHash('sha256').update(reqContext).digest('hex')
return hash
}

RSH Example​

Given the following HTTP request:

GET /api/v1/projects?status=active&type=web&type=mobile&jwt=eyJ0eXAiOiJKV1QiLCJhbGciOiJIUzI1NiJ9...

RSH calculation process:

  1. Method: GET
  2. URI: /api/v1/projects
  3. Query Processing:
    • Filter out jwt parameter
    • status=active
    • type=mobile,type=web (multiple values sorted)
    • Parameter sorting: status=active,type=mobile,type=web
  4. Request Context: GET&/api/v1/projects&status=active,type=mobile,type=web
  5. SHA256: Calculate SHA256 hash of the above string

JavaScript Implementation Example​

import crypto from 'crypto'

function generateRSH(method, uri, queryParams) {
// 1. Convert method to uppercase
const processedMethod = method.toUpperCase()

// 2. Escape & symbols in URI
const processedUri = uri.replace(/&/g, '%26')

// 3. Process query parameters
const queryParts = []

for (const [key, value] of Object.entries(queryParams)) {
// Skip jwt parameter
if (key === 'jwt') continue

const escapedKey = encodeURIComponent(key)

// Handle single or multiple values
const values = Array.isArray(value) ? value : [value]

// Sort multiple values
values.sort()

for (const val of values) {
const escapedValue = encodeURIComponent(val)
queryParts.push(`${escapedKey}=${escapedValue}`)
}
}

// Sort parameters and join with commas
queryParts.sort()
const query = queryParts.join(',')

// 4. Build request context
const reqContext = `${processedMethod}&${processedUri}&${query}`

// 5. Calculate SHA256
return crypto.createHash('sha256').update(reqContext).digest('hex')
}

// Example usage
const rsh = generateRSH('GET', '/api/v1/projects', {
status: 'active',
type: ['web', 'mobile'],
jwt: 'eyJ0eXAiOiJKV1QiLCJhbGciOiJIUzI1NiJ9...',
})

console.log('RSH:', rsh)
// Request context: GET&/api/v1/projects&status=active,type=mobile,type=web
// Output:
// RSH: 80e7f6b966cc71c08502a935930b82fd44498799dae2c6ad71a8c765cad1a5a1

Golang Implementation Example​

package main

import (
"crypto/sha256"
"encoding/hex"
"fmt"
"net/url"
"sort"
"strings"
)

func generateRSH(method, uri string, queryParams map[string]interface{}) (string, error) {
// 1. Convert method to uppercase
processedMethod := strings.ToUpper(method)

// 2. Ensure URI starts with '/' and escape & symbols
processedURI := uri
if !strings.HasPrefix(processedURI, "/") {
processedURI = "/" + processedURI
}
processedURI = strings.ReplaceAll(processedURI, "&", "%26")

// 3. Process query parameters
var queryParts []string
for key, val := range queryParams {
// Skip jwt parameter
if key == "jwt" {
continue
}

escapedKey := url.QueryEscape(key)

// Handle single or multiple values
var values []string
switch v := val.(type) {
case string:
values = []string{v}
case []string:
values = v
case []interface{}:
for _, item := range v {
values = append(values, fmt.Sprintf("%v", item))
}
default:
values = []string{fmt.Sprintf("%v", v)}
}

// Sort multiple values for the same key
sort.Strings(values)

for _, value := range values {
escapedValue := url.QueryEscape(value)
queryParts = append(queryParts, escapedKey+"="+escapedValue)
}
}

// Sort parameters by key
sort.Strings(queryParts)
query := strings.Join(queryParts, ",")

// 4. Build request context
reqContext := processedMethod + "&" + processedURI + "&" + query

// 5. Calculate SHA256
hash := sha256.Sum256([]byte(reqContext))
return hex.EncodeToString(hash[:]), nil
}

func main() {
// Example usage
rsh, err := generateRSH("GET", "/api/v1/projects", map[string]interface{}{
"status": "active",
"type": []string{"web", "mobile"},
"jwt": "eyJ0eXAiOiJKV1QiLCJhbGciOiJIUzI1NiJ9...",
})

if err != nil {
fmt.Printf("Error: %v\n", err)
return
}

fmt.Printf("RSH: %s\n", rsh)
// Request context: GET&/api/v1/projects&status=active,type=mobile,type=web
// Output:
// RSH: 80e7f6b966cc71c08502a935930b82fd44498799dae2c6ad71a8c765cad1a5a1
}

Important Notes​

  • RSH validation is optional and only performed when the JWT claims contain an rsh field
  • The jwt parameter is automatically excluded when calculating RSH
  • Parameter value sorting and escaping rules must be strictly followed, otherwise validation will fail
  • The & symbol in URI must be escaped as %26

Security Compliance​

Data Protection Requirements​

  • Encrypt sensitive data at rest and in transit
  • Implement proper access controls and audit logs
  • Follow data retention and deletion policies
  • Comply with regional privacy regulations

Security Monitoring​

// Security event monitoring
function logSecurityEvent(type, details) {
const event = {
timestamp: new Date().toISOString(),
type: type,
details: details,
severity: getSeverityLevel(type),
}

// Send to security monitoring system
securityMonitor.log(event)

// Alert on high-severity events
if (event.severity === 'HIGH') {
alertingSystem.notify(event)
}
}