Hosted App Manifest
Overview
The Hosted App manifest file (opkx.json) is a JSON configuration file that describes your Hosted App's metadata, runtime configuration, and resource requirements. This file is required for all Hosted Apps and must be included in the .opkx package.
File Location
The opkx.json file must be placed in the root directory of your application package and will be included in the .opkx file when packaging your application.
Schema Structure
The opkx.json file contains two main sections:
app: Application metadata and configurationruntime: Runtime environment and resource configuration
App Configuration
id: Unique application identifier (format:app_+ 16 lowercase alphanumeric characters)name: Application name (1-64 characters)version: Semantic version (e.g.,v1.0.0)auth: Authentication configuration (currently onlyjwtis supported)lifecycle_callback: Lifecycle callback endpointsdesc(optional): Application descriptionlogo(optional): Application logo URLoauth(optional): OAuth configurationevents(optional): Event webhook configurationextensions(optional): Extension points configurationones_version(optional): ONES version compatibility requirements
Runtime Configuration
The runtime field configures the runtime environment for your Hosted App.
Required Runtime Fields
type: Runtime type"ones-node-22": Use ONES's built-in Node.js 22 runtime"container": Use a custom container image
healthcheck: Health check configurationpath: HTTP health check path (must start with/)
Optional Runtime Fields
resources(object, optional): Resource limitscpu(string, required if resources specified): CPU resource (e.g.,"500m","1","1.5")memory(string, required if resources specified): Memory resource (e.g.,"256Mi","1Gi")
arch(string, optional): Runtime architecture"amd64"(default)"arm64"
image(string, optional): Container image name (required forcontainertype)- Must start with
ones/platform-app/ - Format:
ones/platform-app/{name}:{tag}
- Must start with
command(array, optional): Startup command array- Example:
["node", "index.js"] - Maximum 8 items
- Example:
args(array, optional): Startup arguments- Appended to command
- Maximum 8 items
Example Manifest
Here's a complete example of an opkx.json file:
{
"app": {
"id": "app_1234567890abcdef",
"name": "Sample Hosted App",
"desc": "This is a sample hosted app",
"version": "v1.0.0",
"auth": {
"type": "jwt"
},
"lifecycle_callback": {
"install": "/install_cb"
},
"oauth": {
"type": ["user"],
"scope": ["read:project:issue"]
},
"events": {
"url": "/events/webhook",
"types": [
{
"eventType": "ones:project:issue:created"
}
]
}
},
"runtime": {
"type": "ones-node-22",
"healthcheck": {
"path": "/health"
},
"resources": {
"cpu": "500m",
"memory": "512Mi"
},
"command": ["node", "dist/backend/index.js"]
}
}
Runtime Type Examples
Using ONES Node.js 22 Runtime
This is the simplest configuration for Node.js applications:
{
"app": {
"id": "app_1234567890abcdef",
"name": "My Node.js App",
"version": "v1.0.0",
"auth": {
"type": "jwt"
},
"lifecycle_callback": {
"install": "/install_cb"
}
},
"runtime": {
"type": "ones-node-22",
"healthcheck": {
"path": "/health"
},
"resources": {
"cpu": "500m",
"memory": "512Mi"
},
"command": ["node", "dist/backend/index.js"]
}
}
Using Custom Container
For custom container images:
{
"app": {
"id": "app_1234567890abcdef",
"name": "My Custom App",
"version": "v1.0.0",
"auth": {
"type": "jwt"
},
"lifecycle_callback": {
"install": "/install_cb"
}
},
"runtime": {
"type": "container",
"image": "ones/platform-app/my-app:v1.0.0",
"healthcheck": {
"path": "/health"
},
"command": ["node", "index.js"],
"args": ["--port", "3000"],
"resources": {
"cpu": "500m",
"memory": "512Mi"
},
"arch": "amd64"
}
}
Resource Configuration
CPU Resources
CPU can be specified in two formats:
- Millicores:
"500m"(500 millicores = 0.5 CPU) - Cores:
"1"or"1.5"(1 core or 1.5 cores)
Examples:
"500m"- 0.5 CPU cores"1"- 1 CPU core"1.5"- 1.5 CPU cores
Memory Resources
Memory must be specified with a unit suffix:
- Mi: Mebibytes (e.g.,
"256Mi") - Gi: Gibibytes (e.g.,
"1Gi") - M: Megabytes (e.g.,
"512M") - G: Gigabytes (e.g.,
"2G")
Examples:
"256Mi"- 256 mebibytes"512Mi"- 512 mebibytes"1Gi"- 1 gibibyte"2G"- 2 gigabytes
Health Check Configuration
The health check endpoint is used by the platform to monitor your application's health. The path must:
- Start with
/ - Return a successful HTTP status code (
200) when the application is healthy - Be accessible without authentication
Example health check implementation:
@Controller()
export class AppController {
@Get('/health_check')
healthCheck() {
return { ok: true }
}
}
Validation
The manifest file is validated against the schema when you upload your .opkx file. Common validation errors include:
- Missing required fields
- Invalid field formats (e.g., incorrect app ID format)
- Invalid resource specifications
Schema Reference
You can refer to the Hosted App manifest schema to know more about the complete schema definition.
Hosted App manifest schema
Properties
"jwt"^/[^#\s]*$^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$"ONES""Custom"^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$^[a-zA-Z0-9]+$^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$^[a-zA-Z0-9]+$^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$"detail""create""transition"^app_[0-9a-z]{16}$^/[^#\s]*$^[a-z]+:[0-9a-zA-Z\-]+:[0-9a-zA-Z\-]+$"app""user""ones-node-22""container"^/.*^([0-9]+m|[0-9]+(\.[0-9])?)$^[0-9]+(M|G|Gi|Mi)$"amd64""arm64"^ones/platform-app/[a-z0-9-_]+:[a-z0-9-_.]+$^[_a-z0-9]{1,32}$^[_a-z0-9]{1,64}$^[_a-z0-9]{1,64}$^[_a-z0-9]{1,64}$Definitions
httpUrl
uri^https?://[^\s?#]+$urlPath
^/[^#\s]*$semanticVersion
^v\d+\.\d+\.\d+$logoUrl
uri-reference^(https?://[^\s?#]+|/[^\s?#]+)$Development
See ONES CLI to develop and deploy Hosted Apps.
Best Practices
- Version Management: Always use semantic versioning for your app version
- Resource Sizing: Start with minimal resources and scale up as needed
- Health Checks: Implement a lightweight health check endpoint
- Error Handling: Ensure your application handles lifecycle callbacks gracefully
Next Steps
- Learn about the Hosted App Storage format
- Review the Getting Started guide for creating your first app
- Explore ONES CLI for building and deploying Hosted Apps