跳到主要内容

Object Storage SDK

Prerequisites​

  • Before calling Object Storage SDK, declare object storage in your manifest first. See: Hosted App Storage.
  • Import @ones-open/node-sdk in backend and use storage:
  • For cross-language or direct HTTP integration, see: ONES Hosted API / Storage API.
src/index.ts
import { storage } from '@ones-open/node-sdk'

const object = storage.object

Constraints​

Upload/Update an Object​

Uploading an object requires two steps:

  • Step 1: Use the SDK to obtain the upload address and parameters.
  • Step 2: Use the upload address and parameters (including the target file) to upload the object.

Upload Pre-signing​

  • Key must satisfy Object key specification
  • The pre-signed address has a validity period and needs to be re-signed after it expires.

Example usage:

src/index.ts
import { storage } from '@ones-open/node-sdk'
import type { ObjectStoreUploadResult } from '@ones-open/node-sdk'

const object = storage.object

const result = <ObjectStoreUploadResult>await object.upload('cover')
// Request on Hosted App backend
const url = result.getUrl()
// Request on Hosted App frontend
const webUrl = result.getWebUrl()
// The FormData parameter of the request
const fields = result.getFields()

Return type:

src/index.ts
type result = {
getUrl(): string // Request on Hosted App backend
getWebUrl(): string // Request on Hosted App frontend
getFields(): ObjectResultDataFields // The FormData parameter of the request
}
type ObjectResultDataFields = Record<string, string>

Upload an Object (Backend)​

The specific upload method is implemented by the business.

Example usage:

  • url, obtained through result.getUrl().
  • data, create an instance of FormData.
    • FormData, in Node.js, you need to implement FormData yourself.
      • Or use a third-party library from the community, such as formdata-node@5.0.1.
    • fields, get them through result.getFields() and pass them through one by one.
      • If the key of fields is missing or its content is modified, verification will fail.
    • file, the binary data and file name of the uploaded object.
      • If your file is base64 or Buffer, you can convert it to Blob type data.
  • method, set to post.
  • headers, set Content-Type to multipart/form-data.
  • The status of a successful upload is 201.
src/index.ts
import { FormData } from 'formdata-node' // formdata-node@5.0.1
import { storage } from '@ones-open/node-sdk'
import type { ObjectStoreUploadResult } from '@ones-open/node-sdk'

const object = storage.object

const result = <ObjectStoreUploadResult>await object.upload('cover')

// case: 'https://example.com/upload/'
const url = result.getUrl()
// case: { Policy: 'policy', ... }
const fields = result.getFields()

const form = new FormData()
Object.keys(fields).forEach((key) => {
const value = fields[key]
form.append(key, value)
})
const blob = new Blob([buffer]) // cover blob data
form.append('file', blob, 'cover')

// axios or fetch or any request methods
axios({
url,
data: form,
method: 'post',
headers: {
'Content-Type': 'multipart/form-data',
},
}).then((response) => {
console.log(response)
if (response.status === 201) {
console.log('uploaded successfully')
}
})

Upload an Object (Frontend)​

The specific upload method is implemented by the business.

Example usage:

  • url, obtained through result.getWebUrl().
    • You need to implement an API endpoint in your Hosted App.
    • First call the SDK method, and then return the result to the frontend.
    • The returned address is an absolute path.
  • data, create an instance of FormData.
    • fields, get them through result.getFields() and pass them through one by one.
      • You need to implement an API endpoint in your Hosted App.
      • First call the SDK method, and then return the result to the frontend.
      • If the key of fields is missing or its content is modified, verification will fail.
    • file, obtained through <input type="file">.
  • method, set to post.
  • headers, set Content-Type to multipart/form-data.
  • The status of a successful upload is 201.
src/index.ts
import { storage } from '@ones-open/node-sdk'
import type { ObjectStoreUploadResult } from '@ones-open/node-sdk'

const object = storage.object

export async function hello() {
const result = <ObjectStoreUploadResult>await object.upload('cover')
return {
body: {
url: result.getWebUrl(),
fields: result.getFields(),
}
}
}
frontend/src/example/index.tsx
const handleClick = async () => {
const response = await fetch('/api/hello')

// case1: 'https://example.com/upload/'
// case2: '/upload/'
const url = response.data.url
// case: { Policy: 'policy', ... }
const fields = response.data.fields

const form = new FormData()
Object.keys(fields).forEach((key) => {
const value = fields[key]
form.append(key, value)
})
const input = document.querySelector('input')
const file = input!.files?.[0] // file from <input type="file">
form.append('file', file!)

// axios or fetch or any request methods
axios({
url,
data: form,
method: 'post',
headers: {
'Content-Type': 'multipart/form-data',
},
}).then((response) => {
console.log(response)
if (response.status === 201) {
console.log('uploaded successfully')
}
})
}

Download an Object​

Downloading an object requires two steps:

  • Step 1: Use the SDK to obtain the download address.
  • Step 2: Use the download address to download the object.

Download Pre-signature​

  • Key must satisfy Object key specification
  • The pre-signed address has a validity period and needs to be re-signed after it expires.

Example usage:

src/index.ts
import { storage } from '@ones-open/node-sdk'
import type { ObjectStoreDownloadResult } from '@ones-open/node-sdk'

const object = storage.object

const result = <ObjectStoreDownloadResult>await object.download('cover')
// Request on Hosted App backend
const url = result.getUrl()
// Request on Hosted App frontend
const webUrl = result.getWebUrl()

Return type:

src/index.ts
type result = {
getUrl(): string // Request on Hosted App backend
getWebUrl(): string // Request on Hosted App frontend
}

Download an Object (Backend)​

The specific download method is implemented by the business.

Example usage:

  • url, obtained through result.getUrl().
  • method, set to get.
src/index.ts
import { storage } from '@ones-open/node-sdk'
import type { ObjectStoreDownloadResult } from '@ones-open/node-sdk'

const object = storage.object

const result = <ObjectStoreDownloadResult>await object.download('cover')

// case: 'https://example.com/download/'
const url = result.getUrl()

// axios or fetch or any request methods
axios({
url,
method: 'get',
}).then((response) => {
console.log(response)
})

Download an Object (Frontend)​

The specific download method is implemented by the business.

  • The file name of the downloaded file can be customized using the download attribute of the <a> tag.

Example usage:

  • url, obtained through result.getWebUrl().
    • You need to implement an API endpoint in your Hosted App.
    • First call the SDK method, and then return the result to the frontend.
    • The returned address is an absolute path.
src/index.ts
import { storage } from '@ones-open/node-sdk'
import type { ObjectStoreDownloadResult } from '@ones-open/node-sdk'

const object = storage.object

export async function hello() {
const result = <ObjectStoreDownloadResult>await object.download('cover')
return {
body: {
url: result.getWebUrl(),
}
}
}
frontend/src/example/index.tsx
const handleClick = async () => {
const response = await fetch('/api/hello')

// case1: 'https://example.com/download/'
// case2: '/download/'
const url = response.data.url

const a = document.createElement('a')
a.href = url
a.setAttribute('download', 'cover')
a.click()
}

Preview a File or Image (Frontend)​

The specific preview method is implemented by the business.

  • The browser does not support the preview file type, and the business needs to implement the preview logic.
  • If the file address is opened in the browser, the default behavior is downloading.

Example usage:

  • url, obtained through result.getWebUrl().
    • You need to implement an API endpoint in your Hosted App.
    • First call the SDK method, and then return the result to the frontend.
    • The returned address is an absolute path.
src/index.ts
import { storage } from '@ones-open/node-sdk'
import type { ObjectStoreDownloadResult } from '@ones-open/node-sdk'

const object = storage.object

export async function hello() {
const result = <ObjectStoreDownloadResult>await object.download('cover')
return {
body: {
url: result.getWebUrl(),
}
}
}
frontend/src/example/index.tsx
const response = await fetch('/api/hello')

// case1: 'https://example.com/download/'
// case2: '/download/'
const url = response.data.url

const preview = <img src={url}></img>

Delete an Object​

Example usage:

src/index.ts
import { storage } from '@ones-open/node-sdk'

const object = storage.object

object.delete('cover')

Get an Object Metadata​

Example usage:

src/index.ts
import { storage } from '@ones-open/node-sdk'
import type { ObjectMetadataResultData } from '@ones-open/node-sdk'

const object = storage.object

const data = <ObjectMetadataResultData>await object.metadata('cover')
console.log(data.object_key)
console.log(data.size)

Return type:

src/index.ts
type data = {
object_key: string
size: number
}

SDK Error Handling​

All object operations are asynchronous.

For error handling of the following methods, please refer to the example usage:

  • upload
  • download
  • delete
  • metadata

Example usage:

src/index.ts
import { storage } from '@ones-open/node-sdk'
import type { ObjectError, ObjectStoreUploadResult } from '@ones-open/node-sdk'

const object = storage.object

// Catching errors
async function hello() {
const result = await object.upload('cover')
if (result instanceof object.ObjectError) {
throw result
}
return {
url: result.getWebUrl(),
fields: result.getFields(),
}
}

// Not catching errors
async function hello() {
const result = <ObjectStoreUploadResult>await object.upload('cover')
return {
url: result.getWebUrl(),
fields: result.getFields(),
}
}

Return type:

src/index.ts
type ObjectError = {
code: string
err_msg: string
}

SDK Error Code​

Error codeDescription
ObjectKeyInvalidObject key is empty. Or contains illegal characters. Or exceeds maximum length limit.
ObjectKeyNotfoundObject key is not found.
RequestTimeOutRequest timeout.

If an error occurs when uploading or downloading an object, the S3 standard error code is returned. For details, please refer to: S3 error code.