跳到主要内容

Create issue field

Requirements​

ONES
v6.0.83+,v6.1.66+

Event Body​

Create Issue Field Event Schema

Common structure

eventData

FieldTypeDescription
organizationIDstringOrganization that triggered the event. May be empty.
teamIDstringTeam that triggered the event. May be empty.
triggerUserIDstringUser that triggered the event. May be empty.
idstringID of the issue field associated with the event.
namestringName of the issue field associated with the event.
propertyTypeLabelStringType label of the issue field.
fieldSettingFieldSettingSettings of the issue field.

propertyTypeLabel string enum

EnumDescription
appear_timeAppear time.
dateDate.
department_listMultiple options department.
floatFloat.
integerInteger.
multi_line_textMulti-line Text.
multi_optionMultiple options menu.
optionSingle option menu.
project_listMultiple options project.
sprintSingle option sprint.
stay_countNumber of stays.
stay_timeTime of stays
step_rangeInterval time
textSingle-line Text.
timeTime.
userSingle option member.
user_listMultiple options member.

FieldSetting

FieldTypeDescription
optionOptionInfoValid for type of issue field which is 'option' or 'multi_option'.
stepRangeStepRangeValid for type of issue field which is 'step_range'.
appearTimeFieldWithMethodValid for type of issue field which is 'appear_time'.
stayFieldValid for type of issue field which is 'stay_time' or 'stay_count'.

OptionInfo

FieldTypeDescription
optionTotalnumberTotal number of the options
optionsOption[]Part of the option items (the maximum number is 1024).

Option

FieldTypeDescription
idstringID of the option.
valueanyValue of the option.

StepRange

FieldTypeDescription
startFieldWithMethodStart time of the issue field.
endFieldWithMethodEnd time of the issue field.

Field

FieldTypeDescription
fieldTypestringType of the issue field.
fieldIDstringID of the issue field associated with the event.
fieldOptionIDstringOption id of the issue field.

FieldWithMethod

FieldTypeDescription
fieldTypestringType of the issue field.
fieldIDstringID of the issue field associated with the event.
fieldOptionIDstringOption id of the issue field.
methodstringfirst_at: the first appear time,last_at: the last appear time

Example​

{
"eventType": "ones:setting:issue-field:created",
"eventID": "Re6FSci9-1773166207945625601",
"timestamp": "1709005723000",
"eventData": {
"organizationID": "mkobhu1u",
"teamID": "wsxcdejk",
"triggerUserID": "tgbvfr34",
"id": "U1wWJ5cU",
"name": "Name of the issue associated with the event.",
"propertyTypeLabel": "option",
"fieldSetting": {
"option": {
"optionTotal": 1,
"options": [
{
"id": "je6FSci9",
"value": "value"
}
]
},
"stepRange": {
"start": {
"fieldType": 1,
"fieldID": "je6FS3sk",
"fieldOptionID": "S2sk2e6F",
"method": "first_at"
},
"end": {
"fieldType": 1,
"fieldID": "je6FS4sk",
"fieldOptionID": "S2sk2e7F",
"method": "last_at"
}
},
"appearTime": {
"fieldID": "je6FS5sk",
"fieldOptionID": "S2sk2e8F",
"method": "first_at"
},
"stay": {
"fieldType": 1,
"fieldID": "je6FS6sk",
"fieldOptionID": "S2sk2e9F"
}
}
},
"subscriberID": "Re6FSci9"
}