Externally Hosted App: Local Development
Overview
Use this guide to build and validate an externally hosted app on your local machine.
Most developers should build apps as ONES-Hosted Apps. See Getting Started for a simpler way to build apps.
In this guide, you will create a simple ONES app (a web application that integrates with ONES) and connect it to ONES from your local environment.
If you already have a web service, you can skip Create an App Project and integrate your existing application.
Prerequisites
- Your preferred IDE or text editor, such as VS Code.
- A basic understanding of HTML, CSS, and JavaScript.
- A basic understanding of ONES.
- Access to a self-hosted ONES instance or a ONES Cloud account.
- Node.js (version 20 or later).
- Optional: A tunnel tool such as ngrok or LocalTunnel, which lets ONES access your local server.
Set Up Your Development Environment
- Prepare your local environment for building an app for ONES.
- Prepare your ONES environment for testing and validating app installation.
You can install your ONES instance by following the ONES Installation Guide.
Or sign up for a ONES Cloud account at ones.com.
Create an App Project
We use NestJS to create a sample ONES app.
- Create a new project.
$ npm i -g @nestjs/cli
$ nest new ones-example-app
$ cd ones-example-app
❯ nest new ones-example-app
✨ We will scaffold your app in a few seconds..
✔ Which package manager would you ❤️ to use? npm
CREATE ones-example-app/.prettierrc (51 bytes)
CREATE ones-example-app/README.md (5028 bytes)
CREATE ones-example-app/eslint.config.mjs (836 bytes)
CREATE ones-example-app/nest-cli.json (171 bytes)
CREATE ones-example-app/package.json (2042 bytes)
CREATE ones-example-app/tsconfig.build.json (97 bytes)
CREATE ones-example-app/tsconfig.json (544 bytes)
CREATE ones-example-app/src/app.controller.ts (274 bytes)
CREATE ones-example-app/src/app.module.ts (249 bytes)
CREATE ones-example-app/src/app.service.ts (142 bytes)
CREATE ones-example-app/src/main.ts (228 bytes)
CREATE ones-example-app/src/app.controller.spec.ts (617 bytes)
CREATE ones-example-app/test/jest-e2e.json (183 bytes)
CREATE ones-example-app/test/app.e2e-spec.ts (674 bytes)
✔ Installation in progress... ☕
🚀 Successfully created project ones-example-app
cd ones-example-app
Build your app manifest
- Create a new file called
manifest.jsonin the root directory of your project. - Generate a random App ID. (You can also define one manually. It must start with
app_and be 20 characters long.)
- Add the following content to the
manifest.jsonfile. (Replace theidwith the App ID you generated.)
{
"id": "app_<your-app-id>",
"name": "Test ONES App",
"desc": "This is a test app",
"version": "v0.0.1",
"base_url": "",
"auth": {
"type": "jwt"
},
"lifecycle_callback": {
"install": "/install_cb"
}
}
Refer to the App manifest schema for field-level details.
App manifest schema
Properties
"jwt"^/[^#\s]*$"ONES""Custom"^[a-zA-Z0-9]+$^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$^[a-zA-Z0-9]+$^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$"detail""create""transition"^app_[0-9a-z]{16}$^/[^#\s]*$^[a-z]+:[0-9a-zA-Z\-]+:[0-9a-zA-Z\-]+$"app""user"Definitions
extensionKey
extensionUrlPath
^/[^\s?#]*([?][^\s#]*)?([#][^\s]*)?$httpUrl
uri^https?://[^\s?#]+$semanticVersion
^v\d+\.\d+\.\d+$urlPath
^/[^#\s]*$Or use our App Manifest Builder to build the App manifest content.
Add sample code and test the project
- Add the following to
src/app.controller.ts(specifically@Get('/manifest')and@Post('/install_cb')).
The full file should look like this:
import {
Controller,
Get,
HttpException,
HttpStatus,
Post,
Res,
Body,
} from '@nestjs/common';
import type { Response } from 'express';
import { readFileSync } from 'fs';
import { join } from 'path';
@Controller()
export class AppController {
constructor() {}
@Get('')
getHello(@Res() res: Response) {
this.getManifest(res);
}
@Get('/manifest')
getManifest(@Res() res: Response) {
try {
const manifestPath = join(process.cwd(), 'manifest.json');
const manifestData = readFileSync(manifestPath, 'utf8');
res.send(manifestData);
} catch {
throw new HttpException(
'No manifest file',
HttpStatus.INTERNAL_SERVER_ERROR,
);
}
}
@Post('/install_cb')
handleInstallCB(@Body() requestBody: any, @Res() res: Response) {
res.status(HttpStatus.OK).send('success');
}
}
- Install dependencies and run the project by executing
npm installandnpm startin the project directory.
❯ npm install
added 1 package, and audited 799 packages in 2s
153 packages are looking for funding
run `npm fund` for details
found 0 vulnerabilities
❯ npm start
[Nest] *** LOG [NestFactory] Starting Nest application...
[Nest] *** LOG [InstanceLoader] AppModule dependencies initialized +9ms
[Nest] *** LOG [RoutesResolver] AppController {/}: +1ms
[Nest] *** LOG [RouterExplorer] Mapped {/, GET} route +1ms
[Nest] *** LOG [RouterExplorer] Mapped {/manifest, GET} route +0ms
[Nest] *** LOG [RouterExplorer] Mapped {/install_cb, POST} route +1ms
[Nest] *** LOG [NestApplication] Nest application successfully started +0ms
- Test the project with
curl.
❯ curl http://localhost:3000/manifest
{
"id": "app_<your-app-id>",
"name": "Test ONES App",
"desc": "This is a test app",
"version": "v0.0.1",
"base_url": "",
"auth": {
"type": "jwt"
},
"lifecycle_callback": {
"install": "/install_cb"
}
}%
Expose the app
- Expose the app to the internet.
If you use ngrok, run the following command. The app will then be accessible at https://your-app.ngrok.io.
❯ ngrok http http://localhost:3000
Session Status online
Version 3.0.0
Region United States (us)
Web Interface http://127.0.0.1:4040
Forwarding https://your-app.ngrok.io -> http://localhost:3000
Connections ttl opn rt1 rt5 p50 p90
22 0 0.00 0.00 0.00 0.00
- Update the
base_urlin themanifest.jsonfile.
{
"id": "app_<your-app-id>",
"name": "Test ONES App",
"desc": "This is a test app",
"version": "v0.0.1",
"base_url": "https://your-app.ngrok.io",
"auth": {
"type": "jwt"
},
"lifecycle_callback": {
"install": "/install_cb"
}
}
Install and enable the app
Note: Check you have the permission to install apps in your ONES organization.
- Navigate to the ONES instance and find the App Center on the left sidebar.
- Click the App Center to go to the Installed apps page.
- Click the Upload App button and enter the URL of your
manifestinfo(https://your-app.ngrok.io/manifest), and Confirm.

-
Verify the app information, then click
Confirmto install the app.
-
The app will be installed and you can see it in the Installed apps page. After installation, the app appears in the list. Click it to view details.
-
Click the
Enablebutton to enable the app.
Next steps
Choose a deployment target, either your own server or a cloud provider.
Deploy your app, get a stable public URL, and update the base_url in manifest.json.