跳到主要内容

App Identity Delegation

App Identity Delegation allows a ONES App to obtain an OpenAPI access token from installation context and call OpenAPI at runtime.

You can use it in two modes:

  • App identity: the app calls OpenAPI as the installed app itself.
  • User identity: the app calls OpenAPI on behalf of a specific user.

If the app declares redirect_url, it can also use the authorization code flow.

OAuth capability in app configuration​

Declare OAuth capability in opkx.json under app.oauth.

  • scope: the scopes requested by the app. See Scopes.
  • type: app, user, or both. app enables app identity token exchange and user enables user identity token exchange.
  • redirect_url: callback path for authorization code flow. It must start with /, for example /oauth/callback.
Example/opkx.json
"app": {
"oauth": {
"scope": ["read:account:teams"],
"type": ["user", "app"],
"redirect_url": "/oauth/callback"
}
}

Capability mapping:

  • Declaring type enables token exchange through JWT Assertion.
  • Declaring redirect_url enables authorization code flow.
  • You can declare both and choose the flow based on the runtime scenario.

Getting an access token​

The identity semantics are the same across both flows:

  • App identity: do not pass userID in SDK calls or uid in manual JWT claims.
  • User identity: pass userID in SDK calls or uid in manual JWT claims.

Method 1: JWT Assertion​

Use this method when the app exchanges installation context for a token at runtime.

Use the SDK​

  1. Save installation_id, shared_secret, and ones_base_url from the install callback.
  2. Use the SDK at runtime to exchange installation information for an access token.
  3. Call OpenAPI with Authorization: Bearer <access_token>.

Node SDK example:

import { oauth } from '@ones-open/node-sdk'

const accessToken = await oauth.getAccessTokenByInstallationInfo(installationInfo, userID)
  • Omit userID to use app identity.
  • Pass userID to use user identity.

Build the JWT manually​

JWT Assertion format:

<Header>.<Claims>.<Signature>

Example/Header
{
"typ": "JWT",
"alg": "HS256"
}

Claims​

Field NameTypeRequiredDescription
issstringYesApp installation ID
substringYesApp installation ID
audstringYesFixed value: oauth
iatint64YesIssued-at time in Unix seconds
expint64YesExpiration time in Unix seconds
jtistringYesUnique JWT identifier
uidstringNoONES user ID. Omit it to use app identity
信息

The uid field is optional. If it is omitted, the token is issued to the app itself.

Example/Claims
{
"iss": "{app_installation_id}",
"sub": "{app_installation_id}",
"aud": "oauth",
"iat": 1714857600,
"exp": 1714857605,
"jti": "{jwt_unique_identifier}",
"uid": "{ones_user_id}"
}

Signature​

The signature is created with the installation shared_secret.

The shared_secret returned by the install callback is base64 encoded. Decode it before signing.

Example/Signature
signature = SignJWT(shared_secret, base64UrlEncode(header) + "." + base64UrlEncode(claims), "HS256")

Request example:

Example/Exchange Access Token
curl -X POST 'https://your-domain/oauth2/token' \
-H 'Content-Type: application/x-www-form-urlencoded' \
-d 'grant_type=urn:ietf:params:oauth:client-assertion-type:jwt-bearer' \
-d 'assertion={JWT Assertion}'

Response example:

Example/Response
{
"access_token": "CN-xxx-install_xxx",
"expires_in": 7200,
"scope": "read:project:issue,read:project:project",
"token_type": "Bearer",
"user_id": "YTo7x4rY"
}
信息

This method does not generate a refresh token.

Common JWT Assertion validation errors​

When a JWT Assertion fails validation, the OAuth server may reject the token exchange request. Common checks and troubleshooting directions are listed below.

Validation pointTypical issueTroubleshooting
iss / subMissing, inconsistent, or not using the app installation IDEnsure both fields are present, use the same app installation ID, and do not use other identifiers
audMissing oauth audienceEnsure the JWT audience includes oauth
iat / expMissing, expired, exp <= iat, or the valid window is too longEnsure both fields are present, exp is later than iat, and use a short validity window
Clock skewiat appears to be in the futureCheck the issuer machine clock and server clock for time skew
jtiMissing, reused, or malformedGenerate a unique jti for every assertion and avoid replaying the same assertion
SignatureSignature verification failedDecode shared_secret from base64 before signing and use HS256
uidUser identity token exchange failedConfirm the uid is a valid ONES user ID and that the app is expected to act on behalf of that user

Recommended troubleshooting order:

  1. Confirm installation_id and shared_secret come from the latest install callback.
  2. Decode shared_secret from base64 before signing.
  3. Verify iss, sub, aud, iat, exp, and jti one by one.
  4. If you pass uid, confirm the user exists and belongs to the expected ONES context.
  5. Generate a new assertion and retry instead of reusing an old one.

Method 2: Authorization code flow​

If the app declares redirect_url, it can also use the authorization code flow.

This is the ONES equivalent closest to a typical 3LO flow on other platforms:

  1. Redirect the user to /oauth2/authorize.
  2. Receive code on your redirect_url.
  3. Exchange code for access_token at /oauth2/token.

Use authorization code flow when the app needs an explicit user-consent based access flow.