跳到主要内容

App Setting Pages

Overview​

The App Setting Pages extension allows applications to register custom configuration tabs in the App's detail page when the app is installed in the ONES organization.

This feature enables app developers to provide dedicated configuration interfaces for their applications, accessible to application administrators.

Requirements​

ONES
v6.88.0+

Architecture​

The app setting pages extension follows the standard extension pattern:

Extension Declaration​

Basic Structure​

In your app's manifest file, declare the appSettingPages extension under the extensions section:

{
"extensions": {
"appSettingPages": [
{
"key": "myCustomEntries",
"funcs": {
"customEntries": "/custom_page_entries"
}
}
]
}
}

Configuration Fields​

FieldTypeRequiredDescription
keystringYesUnique identifier for this extension provider within the app context
funcsobjectYesBackend interface functions definition
funcs.customEntriesstringYesBackend endpoint path that returns the custom tab entries

Field Constraints​

  • key: Must be unique within the app, alphanumeric characters only (^[a-zA-Z0-9]+$), maximum length 64 characters
  • funcs.customEntries: Valid URL path, maximum length 256 characters

Backend Implementation​

Custom Entries Endpoint​

Implement the endpoint specified in funcs.customEntries to return the list of custom setting tabs.

Request Body​

The ONES platform will send a POST HTTP request body to your endpoint with the following JSON structure:

App Setting Pages Custom Entries Request

Request schema for app setting pages custom entries endpoint

Properties

user_uuid*string
User UUID
Min length: 1
language*string
User language preference (e.g., 'en', 'zh')
Min length: 1
timezone*string
User timezone (e.g., 'Asia/Shanghai', 'UTC')
Min length: 1

Response Body​

HTTP Status Codes: always return 200 status code

Your endpoint should return a JSON response body with the following structure:

App Setting Pages Custom Entries Response

Response schema for app setting pages custom entries endpoint

Properties

entries*array
Array of custom tab entries
Min items: 0Max items: 10
Array items:
itemobject
title*string
Tab title displayed in UI
Min length: 1Max length: 128
page_url*string
Tab content page URL (relative path)
Pattern: ^/.*
Min length: 1Max length: 512

Example Implementation​

Here's an example of how your endpoint might handle the request and return the response:

Example Request:

{
"user_uuid": "DU6krHBN",
"language": "en",
"timezone": "Asia/Shanghai"
}

Example Response:

{
"entries": [
{
"title": "Database Settings",
"page_url": "/modules/database-config/index.html"
},
{
"title": "API Configuration",
"page_url": "/modules/api-config/index.html"
},
{
"title": "Notification Settings",
"page_url": "/modules/notification-config/index.html"
}
]
}

Implementation Notes:

  • Handle the request based on user context (user_uuid, language, timezone)
  • Return localized tab titles based on the user's language preference
  • Ensure all page_url paths are valid and accessible
  • Consider user permissions when determining which tabs to show

Frontend Implementation​

Tab Content Pages​

Create the HTML pages referenced in your PageUrl responses. These pages will be displayed as iframe content within the App Center.

Authentication​

Frontend pages need to authenticate with the ONES platform. Use the client-side API to obtain authentication tokens:

// Get authentication token from ONES platform
var ONES = SDK.ONES
const token = await ONES.getAppToken()

// Use token for API calls to your app backend
fetch('/api/config', {
headers: {
Authorization: `Bearer ${token}`,
},
})

Page Structure Example​

<!doctype html>
<html>
<head>
<title>Database Settings</title>
<meta charset="utf-8" />
</head>
<body>
<div id="app">
<h2>Database Configuration</h2>
<form id="db-config-form">
<div class="form-group">
<label>Database Host:</label>
<input type="text" id="db-host" name="host" />
</div>
<div class="form-group">
<label>Database Port:</label>
<input type="number" id="db-port" name="port" />
</div>
<button type="submit">Save Configuration</button>
</form>
</div>

<script>
// Implementation of configuration page logic
</script>
</body>
</html>

Best Practices​

Security Considerations​

  1. Token Validation: Always validate authentication tokens on the backend
  2. Input Sanitization: Sanitize all user inputs to prevent XSS attacks
  3. Access Control: Implement proper permission checks for configuration operations

User Experience​

  1. Responsive Design: Ensure your configuration pages work well in iframe contexts
  2. Loading States: Provide visual feedback during configuration operations
  3. Error Handling: Display clear error messages for configuration failures
  4. Validation: Implement client-side validation for better user experience

Performance​

  1. Lazy Loading: Load configuration data only when tabs are accessed
  2. Caching: Cache configuration data appropriately to reduce backend calls
  3. Minimal Dependencies: Keep frontend dependencies lightweight for faster loading

Limitations​

  • Maximum of 1 appSettingPages extension provider per application
  • Tab content is displayed in iframe context with security restrictions
  • Configuration changes require proper authentication and authorization

Troubleshooting​

Common Issues​

  1. Tabs not appearing: Check extension declaration syntax and ensure backend endpoint is accessible
  2. Authentication failures: Verify token handling in both frontend and backend
  3. Content not loading: Check for CORS issues and iframe compatibility

Debug Tips​

  1. Check browser console for JavaScript errors in configuration pages
  2. Verify backend endpoint responses match the expected schema
  3. Test authentication token validity and refresh logic
  4. Ensure all URL paths are correctly configured and accessible