跳到主要内容

Manhour Validator

Overview​

The Manhour Validator extension allows applications to implement custom validation logic for work hour entries.

This extension enables organizations to enforce specific business rules, approval workflows, and compliance checks when users log their work hours in ONES.

Requirements​

ONES
v6.88.0+

Use Cases​

  • Business Rule Enforcement: Validate work hours against company policies (e.g., maximum daily hours, minimum break times)
  • Project-specific Validation: Apply different validation rules based on project type or client requirements
  • Approval Workflows: Implement multi-level approval processes for work hour entries
  • Compliance Checks: Ensure work hours comply with labor regulations or contractual agreements
  • Data Quality Control: Validate the accuracy and completeness of time tracking data

Architecture​

The manhour validator extension works by intercepting work hour submission requests and applying custom validation logic before the hours are saved to the system.

Extension Declaration​

In your app's manifest file, declare the manhourValidator extension under the extensions section.

Configuration Fields​

FieldTypeRequiredDescription
keystringYesUnique identifier for this validator within the app context
funcsobjectYesBackend interface functions definition
funcs.validatestringYesBackend endpoint path that performs the validation
Example/manifest.json
{
"extensions": {
"manhourValidator": [
{
"key": "validator1",
"funcs": {
"validate": "/validate_manhour"
}
},
{
"key": "validator2",
"funcs": {
"validate": "/validate_manhour_2"
}
}
]
}
}

Field Constraints​

  • key: Must be unique within the app, alphanumeric characters only (^[a-zA-Z0-9]+$), maximum length 64 characters
  • funcs.validate: Valid URL path, maximum length 256 characters

Backend Implementation​

Validation Endpoint​

Implement the endpoint specified in funcs.validate to perform manhour validation logic.

Request Body​

Manhour Validator Request

Request schema for manhour validator endpoint

Properties

teamUUID*string
Team identifier
Min length: 1
userUUID*string
User identifier who is performing the action
Min length: 1
type*string
Type of manhour operation
Enum values:
"recorded"
"estimated"
"remaining"
action*string
Action to perform
Enum values:
"add"
"update"
"delete"
mode*string
Mode of operation
Enum values:
"simple"
"detailed"
optionsobject
Additional options for the operation
scenestring
Scene context for the operation
Min length: 1
manhour_info*array
Array of ManhourInfo objects containing the manhour data
Min items: 1
Array items:
itemobject
task*object
Task information
UUID*string
Unique identifier of the task
Min length: 1
TeamUUID*string
Team identifier the task belongs to
Min length: 1
Owner*string
Task owner identifier
Min length: 1
Assign*string
Task assignee identifier
Min length: 1
ProjectUUID*string
Project identifier the task belongs to
Min length: 1
IssueTypeUUID*string
Issue type identifier
Min length: 1
ParentUUIDstring
Parent task identifier (for subtasks)
SubIssueTypeUUIDstring
Sub-issue type identifier
IsCreateTask*boolean
Whether this is creating a new task
assess_manhourobject
Estimated manhour information
UUIDstring
Unique identifier of the estimated manhour record
Fromnumber
Start timestamp (Unix timestamp)
Tonumber
End timestamp (Unix timestamp)
HoursFormatstring
Format of hours display
IncludeNonWorkingDaynumber
Whether to include non-working days (0 or 1)
Hoursnumber
Estimated hours
Ownerstring
Owner of the estimated hours
StartTimenumber
Start time (Unix timestamp)
remaining_manhourobject
Remaining manhour information
UUIDstring
Unique identifier of the remaining manhour record
Hoursnumber
Remaining hours
Ownerstring
Owner of the remaining hours
record_manhourobject
Recorded manhour information
UUIDstring
Unique identifier of the recorded manhour record
StartTimenumber
Start time of work (Unix timestamp)
Descriptionstring
Work description
Hoursnumber
Recorded hours
Ownerstring
Owner who recorded the hours

Response​

HTTP Status Codes: always return 200 status code

Manhour Validator Response

Response schema for manhour validator endpoint

One of:

Success Response
Empty object for successful validation
object
Empty object for successful validation
Error Response
Error details when validation fails
object
Error details when validation fails
error*object
Error details when validation fails
reason*string
Human-readable error message describing why validation failed, this will be shown to the user
Min length: 1Max length: 500
level*string
Error level, typically 'error'
Enum values:
"error"
"warning"
"info"

Example Implementation​

Basic Hours Validation​

Example Request:

{
"teamUUID": "team_1234567890abcdef",
"userUUID": "user_1234567890abcdef",
"type": "recorded",
"action": "add",
"mode": "simple",
"options": {
"scene": "timesheet"
},
"manhour_info": [
{
"task": {
"UUID": "task_9876543210fedcba",
"TeamUUID": "team_1234567890abcdef",
"Owner": "user_1234567890abcdef",
"Assign": "user_1234567890abcdef",
"ProjectUUID": "project_abcdef1234567890",
"IssueTypeUUID": "issuetype_123456789",
"ParentUUID": "",
"SubIssueTypeUUID": "",
"IsCreateTask": false
},
"assess_manhour": {},
"remaining_manhour": {},
"record_manhour": {
"UUID": "",
"StartTime": 1705305600,
"Description": "Development work on feature X",
"Hours": 8.5,
"Owner": "user_1234567890abcdef"
}
}
]
}

Example Response (Success) - HTTP 200:

{}

Example Response (Failure) - HTTP 200:

{
"error": {
"reason": "Daily work hours cannot exceed 12 hours",
"level": "error"
}
}

Validation Logic Examples:

  1. Maximum Hours Check:

    if (request.manhour_info[0].record_manhour.Hours > 12) {
    // Return HTTP 200 with error body
    res.status(200).json({
    error: {
    reason: "Daily work hours cannot exceed 12 hours",
    level: "error"
    }
    });
    return;
    }
  2. Minimum Hours Check:

    if (request.manhour_info[0].record_manhour.Hours < 0.25) {
    // Return HTTP 200 with error body
    res.status(200).json({
    error: {
    reason: "Minimum work hours must be at least 15 minutes (0.25 hours)",
    level: "error"
    }
    });
    return;
    }
  3. Future Date Check:

    const requestDate = new Date(request.manhour_info[0].record_manhour.StartTime * 1000);
    const today = new Date();
    if (requestDate > today) {
    // Return HTTP 200 with error body
    res.status(200).json({
    error: {
    reason: "Cannot log hours for future dates",
    level: "error"
    }
    });
    return;
    }

Advanced Project-based Validation​

Example Request:

{
"teamUUID": "team_1234567890abcdef",
"userUUID": "user_1234567890abcdef",
"type": "recorded",
"action": "add",
"mode": "detailed",
"options": {
"scene": "client_project"
},
"manhour_info": [
{
"task": {
"UUID": "task_9876543210fedcba",
"TeamUUID": "team_1234567890abcdef",
"Owner": "user_1234567890abcdef",
"Assign": "user_1234567890abcdef",
"ProjectUUID": "project_client_work_123",
"IssueTypeUUID": "issuetype_client_work",
"ParentUUID": "",
"SubIssueTypeUUID": "",
"IsCreateTask": false
},
"assess_manhour": {},
"remaining_manhour": {},
"record_manhour": {
"UUID": "",
"StartTime": 1705305600,
"Description": "Client consultation and analysis",
"Hours": 10.0,
"Owner": "user_1234567890abcdef"
}
}
]
}

Validation Logic Examples:

  1. Project Configuration Check:

    const projectUUID = request.manhour_info[0].task.ProjectUUID;
    const projectConfig = await getProjectConfig(projectUUID);
    if (!projectConfig) {
    // Return HTTP 200 with error body
    res.status(200).json({
    error: {
    reason: "Failed to retrieve project configuration",
    level: "error"
    }
    });
    return;
    }
  2. Project-specific Hours Limit:

    const hours = request.manhour_info[0].record_manhour.Hours;
    if (hours > projectConfig.maxDailyHours) {
    // Return HTTP 200 with error body
    res.status(200).json({
    error: {
    reason: `Project allows maximum ${projectConfig.maxDailyHours} hours per day`,
    level: "error"
    }
    });
    return;
    }
  3. Approval Threshold Check:

    const isManager = await isManagerUser(request.userUUID);
    const hours = request.manhour_info[0].record_manhour.Hours;
    if (hours > projectConfig.approvalThreshold && !isManager) {
    // Return HTTP 200 with error body
    res.status(200).json({
    error: {
    reason: "Hours exceeding threshold require manager approval",
    level: "error"
    }
    });
    return;
    }
  4. Client Project Description Requirement:

    const description = request.manhour_info[0].record_manhour.Description;
    if (projectConfig.clientProject && !description?.trim()) {
    // Return HTTP 200 with error body
    res.status(200).json({
    error: {
    reason: "Work description is required for client projects",
    level: "error"
    }
    });
    return;
    }

Example Response (Success) - HTTP 200:

{}

Validation Rules Examples​

Common Validation Patterns​

1. Daily Hours Limit​

// Validate daily total doesn't exceed limit
const userUUID = request.userUUID;
const startTime = request.manhour_info[0].record_manhour.StartTime;
const date = new Date(startTime * 1000).toISOString().split('T')[0];
const hours = request.manhour_info[0].record_manhour.Hours;
const totalHours = await getDailyHours(userUUID, date);
if (totalHours + hours > 8) {
// Return HTTP 200 with error body
res.status(200).json({
error: {
reason: "Total daily hours would exceed 8 hours limit",
level: "error"
}
});
return;
}

2. Consecutive Days Check​

// Prevent logging hours on consecutive days off
const startTime = request.manhour_info[0].record_manhour.StartTime;
const date = new Date(startTime * 1000);
const userUUID = request.userUUID;
const isWeekend = isWeekendDate(date);
const workedPreviousWeekend = await hasWorkedPreviousWeekend(userUUID, date);
if (isWeekend && workedPreviousWeekend) {
// Return HTTP 200 with error body
res.status(200).json({
error: {
reason: "Cannot work consecutive weekends without approval",
level: "error"
}
});
return;
}

3. Time Entry Window​

// Only allow logging hours within 7 days
const startTime = request.manhour_info[0].record_manhour.StartTime;
const requestDate = new Date(startTime * 1000);
const today = new Date();
const daysDiff = (today - requestDate) / (1000 * 60 * 60 * 24);
if (daysDiff > 7) {
// Return HTTP 200 with error body
res.status(200).json({
error: {
reason: "Cannot log hours older than 7 days",
level: "error"
}
});
return;
}

4. User Role Validation​

// Different rules based on user role
const userUUID = request.userUUID;
const hours = request.manhour_info[0].record_manhour.Hours;
const userRole = await getUserRole(userUUID);
switch (userRole) {
case "contractor":
if (hours > 8) {
// Return HTTP 200 with error body
res.status(200).json({
error: {
reason: "Contractors limited to 8 hours per day",
level: "error"
}
});
return;
}
break;
case "intern":
if (hours > 6) {
// Return HTTP 200 with error body
res.status(200).json({
error: {
reason: "Interns limited to 6 hours per day",
level: "error"
}
});
return;
}
break;
}
// Return HTTP 200 for success
res.status(200).json({});

Troubleshooting​

Common Issues​

  1. Validation always fails: Check endpoint implementation and request/response format
  2. Timeout errors: Optimize validation logic or increase timeout limits
  3. Inconsistent behavior: Verify timezone and date handling across different regions
  4. Permission errors: Ensure proper authentication and authorization

Migration from Plugin System​

If migrating from the ONES Plugin 1.0 manhour validator, note these key differences:

  • Registration: Use app manifest instead of plugin configuration
  • Authentication: Use app tokens instead of plugin authentication
  • Deployment: Deploy as app instead of plugin installation
  • API Changes: Updated request/response structures