跳到主要内容

Create a new test case library

POST 

/testcase/libraries

Create a new test case library.

History​

VersionChanges
v3.14.117, v3.15.26Added in: v3.14.117, v3.15.26

Request​

Query Parameters

    teamID stringrequired

    The team ID

Body

required

The test case library information to be created.

    caseFieldConfigurationID string

    Possible values: non-empty and <= 8 characters

    The id of the test case library project configuration.

    name string

    Possible values: non-empty and <= 32 characters

    The name of the test case library.

Responses​

Request is successful.

Schema

    data

    object

    name string

    The name of the test case library.

    id string

    The id of the test case library.

    createTime integer

    The create time of the test case library.

    updateTime integer

    The update time of the test case library.

    stickToTop boolean

    Whether the test case library is at the top.

    caseFieldConfigurationID string

    Test case library configuration ID.

    result string

    The result of this request.

    errorCode string

    The error code of this request.

    errorMsg string

    Error message for this request.

    errorData object

    Error meta data for this request.

Loading...