跳到主要内容

Create a user group

POST 

/account/team/:teamUUID/userGroups

Create a new team user group. Duplicate names are allowed within the same team.

History​

VersionChanges
v6.100.30, v7.0.17, v7.16.0Added in: v6.100.30, v7.0.17, v7.16.0

Request​

Path Parameters

    teamUUID stringrequired

    Team UUID

Body

required

    name stringrequired

    Possible values: <= 256 characters

    User group name; must contain 1 to 256 Unicode code points after trimming leading and trailing whitespace.

    description string

    Possible values: <= 1024 characters

    User group description

    members string[]

    Initial member IDs

Responses​

Request successful

Schema

    data

    object

    id string

    User group ID

    name string

    User group name

    description string

    User group description

    createTime int64

    User group creation time in microseconds

    members string[]

    Current member IDs

Loading...