跳到主要内容

Get project module list

GET 

/project/projectModules

Read all visible modules at every level of one project as a flat list, without pagination, silent truncation or taskCount. projectID must be exactly one valid 16-character project UUID, not the project display code. A GET request body cannot replace query parameters. Missing, empty or whitespace-only values return MissingParameter. Repeated projectID parameters, multiple IDs, array text, literal null, invalid characters or incorrect length return InvalidParameter. Providing only projectID[] is treated as a missing projectID. Surrounding whitespace is trimmed before validating a single value. Invalid requests never broaden the query scope. Personal credentials use the user's project browsing permissions. Organization credentials act as a super administrator only within the authorized organization; access never extends to another organization. An empty project or a syntactically valid but nonexistent project returns an empty array. Modules from another team are never returned. Archived projects and users without browse permission follow the equivalent internal query behavior. The list preserves internal query order; it is not guaranteed to match the UI display order. Use parent.uuid and path to reconstruct the hierarchy. The path joins module UUIDs from root to current module with hyphens. position is unchanged and updateTime is a millisecond timestamp. Root modules have parent.uuid="". Unassigned modules have assign.uuid="", with name and avatar set to null. Empty descriptions remain "". Business errors may return HTTP 200 with result=FAIL, so always check result. Failed responses contain no module data. Gateway authentication, scope and rate-limit errors retain the existing HTTP statuses and error structures. Example request: GET /openapi/v2/project/projectModules?teamID=WSNGZjZK&projectID=RLmQa4hLCRByRZk7 with Authorization: Bearer <access_token>.

Request​

Query Parameters

    teamID stringrequired

    The team ID

    projectID stringrequired

    Possible values: >= 16 characters and <= 16 characters

    One nonempty 16-character project UUID; provide the parameter exactly once.

    Example: RLmQa4hLCRByRZk7

Responses​

Success or business failure; check result.

Schema

    oneOf

    result stringrequired

    Possible values: [SUCCESS]

    data

    object

    required

    list

    object[]

    required

  • Array [

  • key stringrequired

    Full module object key.

    uuid stringrequired

    Module UUID; the field name remains uuid.

    name stringrequired
    position int64required

    Original internal position without scaling or reordering.

    path stringrequired

    Hyphen-separated module UUIDs from root to current module.

    updateTime int64required

    Update time as a millisecond timestamp.

    assign

    object

    required

    uuid stringrequired
    name stringnullablerequired
    avatar stringnullablerequired
    description stringrequired

    parent

    object

    required

    uuid stringrequired

    Parent module UUID; empty string for a root module.

  • ]

Loading...