跳到主要内容

Unlinking issues

POST 

/project/issues/:issueID

Unlinking issues.

History​

VersionChanges
v3.14.117, v3.15.26Added in: v3.14.117, v3.15.26

Request​

Path Parameters

    issueID stringrequired

    ID of the issue

Query Parameters

    action stringrequired
    • action: Actions on issue,support unlink.
    teamID stringrequired

    The team ID

Body

required

List of issues to be unlinked.

    issueIDs string[]required

    Issue ID list.

    linkType stringrequired

    Issue link type.

    linkDescType stringrequired

    Issue link desc type.

Responses​

Request successful

Schema

    result stringrequired

    The result of this request.

    errorCode string

    The error code of this request.

    errorMsg string

    Error message for this request.

    errorData object

    Error meta data for this request.

Loading...