跳到主要内容

Search resources

GET 

/wiki/search/resources

History​

VersionChanges
v6.43.0Added in: v6.43.0

Search resources.

Request​

Query Parameters

    teamID stringrequired

    The team ID

    requestUserID string

    User ID, this parameter can only be passed when calling as an Oauth bot. It is used to perform operations as the specified user

    limit integer

    Possible values: <= 100

    Default value: 50

    The number returned by this request.The default value is 50, exceeding 100 will be truncated to 100

    cursor string

    The starting location of this request

    keyword stringrequired

    Possible values: <= 100 characters

    The search keyword

Responses​

Request is successful.

Schema

    data

    object

    hasNext boolean

    Whether has more result

    nextCursor string

    The start of next page

    total integer

    The total number of matched pages

    resources

    object[]

  • Array [

  • fields

    object

    createdTime integer

    Created time

    mime string

    MIME type of the resource

    name string

    Resource name

    ownerID string

    ID of the user who uploaded the resource

    pageTitle string

    Page title

    pageID string

    Page ID

    referenceID string

    Reference ID

    referenceType string

    Reference type

    spaceName string

    Space name

    spaceID string

    Space ID

    id string

    Resource ID

    highlightFields

    object

    name string[]

    Matched name

    content string[]

    Matched content

  • ]

  • result string

    The result of this request.

    errorCode string

    The error code of this request.

    errorMsg string

    Error message for this request.

    errorData object

    Error meta data for this request.

Loading...