跳到主要内容

Apply for or refresh access token

POST 

/oauth2/token

Apply for or refresh access token.

History​

VersionChanges
v3.14.117, v3.15.26Added in: v3.14.117, v3.15.26

Request​

Body

    client_id string

    The Client ID obtained from creating an OAuth application, which needs to be assigned when applying for or refreshing an access token.

    client_secret string

    The Client Secret obtained from creating an OAuth application, which needs to be assigned when applying for an access token.

    code string

    Authorization code, which needs to be assigned when applying for an access token.

    redirect_uri string

    The Redirect URI configured when creating an OAuth application. It is not mandatory, but can be assigned when applying for an access token.

    grant_type string

    Possible values: [authorization_code, refresh_token]

    authorization_code,chosen when requesting an access token. refresh_token,chosen when refreshing an access token.

    refresh_token string

    Refresh token, which needs to be assigned when refreshing an access token.

Responses​

Request successful.

Schema

    access_token string

    The "Access token" (valid for 1 day).

    refresh_token string

    The "Refresh token" used to refresh the access token (valid for 30 days).

    expires_in integer

    The expiration time of the access token, measured in seconds.

    scope string

    The Open API scopes that the OAuth application can access, separated by commas.

    token_type string

    The type of access token.

    user_id string

    The bot ID of the access token.

    email string

    The bot email of the access token.

Loading...