跳到主要内容

Execute ONESQL query

POST 

/onesql/query

History​

VersionChanges
v6.88.0Added in: v6.88.0

ONESQL Overview​

  • ONESQL is a structured query language for ONES work item data, with syntax similar to SQL, capable of expressing complex conditional logic.

  • Statements consist of fields, operators, values/functions, combined through keywords like AND, OR, NOT; it's recommended to add parentheses for complex logic to ensure consistent results.

  • Supports comparison of multiple field types including numeric, text, member, date, etc., and can combine time/member functions to generate dynamic conditions.

Operator Reference

TypeOperatorsDescriptionExamples
Comparison< &lt; > >= == !=Compare between numeric/date/time/select/work item/member/text; ==, != only accept single valuesDue Date < "2008/12/31 09:00" Assignee != currentUser()
SetIN NOT INWhether field value exists in enumerated set, supports numeric/date/time/select/work item/memberPriority IN (P0, P1) Assignee NOT IN (John, Jane)
NullIS IS NOTCheck if numeric/date/time/select/work item/member/file/text fields are emptyRelated Release IS EMPTY Sprint IS NOT EMPTY
Text Match~ !~Text field fuzzy contains or excludes specified stringTitle ~ "Project Management" Description !~ "Closed"

Common Functions

ScenarioFunctionParametersOverviewExamples
Time Pointnow(offset)(+/-)nn(y/M/w/d/h/m), default + and dayCurrent time plus/minus offsetCreated Time > now(-1d)
Start TimeStartOfDay/Week/Month/Year(offset)Same as above, default units are day, week, month, yearCalculate start moment of corresponding time unit then offsetCreated Date > StartOfWeek(-1)
End TimeEndOfDay/Week/Month/Year(offset)Same as aboveCalculate end moment of corresponding time unit then offsetDue Date < EndOfMonth(+15d)
Member SetDepartmentOf(names)Department name listReturn members of each departmentAssignee IN DepartmentOf(Product, Development)
Member SetGroupOf(names)User group name listReturn members of each user groupAssignee IN GroupOf(Testing)
Member SetRolesOf(names)Role name listReturn members of each roleAssignee IN RolesOf(CDT Team)
Current UsercurrentUser()NoneCurrent logged-in userAssignee == currentUser()
Hierarchy Propertyexpand(values)Node value listExpand single/multi-select cascade or module properties to child nodesLocation IN expand(Jiangsu, Zhejiang)

Keywords and Syntax Rules

  • Logic keywords: AND (and), OR (or), NOT (not), EMPTY (null check), case insensitive.

  • Default priority is parentheses > AND > OR, recommend using parentheses for clear grouping.

  • Text constants need quotes (single/double both work); time function parameters don't need quotes.

  • Date fields support yyyy/MM/dd HH:mm, yyyy-MM-dd HH:mm, yyyy/MM/dd, yyyy-MM-dd formats; interval fields support (+/-)XdYhZm.

Common Query Fragments

  • Current user's incomplete tasks: uid(field004) == currentUser() AND uid(field_status) != uid('status_done_uuid')

  • Defects created last week: uid(field_issue_type) == uid('defect_uuid') AND uid(field013) > StartOfWeek(-1) AND uid(field013) < StartOfWeek()

  • Specific department assignee: uid(field004) IN DepartmentOf(uid('department_uuid'))

  • Due before 15th of next month: uid(field010) < EndOfMonth(+15d) (Example field_status, field_issue_type, defect_uuid etc. need to be replaced with actual field or option UUIDs.)

OpenAPI Query Points

  • Execute statements through POST /onesql/query, need to explicitly specify data source (like FROM issue), LIMIT offset, size, ORDER BY, GROUP BY clauses are consistent with standard ONESQL semantics.

  • If your app manifest (plugin.yaml / opkx.json) declares ONESQL access, configure OAuth scope as read:project:issue; otherwise upload may fail with OAuth validation errors.

  • ONESQL provides more flexible custom field queries than fieldValues in GET /openapi/v2/project/issues/{issueID}.

  • When accessing fields and sub-properties use uid(fieldUUID[.subField]), constant UUIDs written as uid('xxx'); placeholders $1, $2 etc. assigned in variables array.

  • Pagination uses v$cursor comparison operations (like v$cursor > '') with limit; set conditions can mix currentUser(), DepartmentOf(), RolesOf() and other functions.

Query a specific issue field by field ID

select uuid, uid(field_xxxxx) as target_field
from issue
where uid(uuid) in (uid('ISSUE_UUID'))

Replace field_xxxxx with the target field ID. For reference-type fields, specify sub-properties explicitly, e.g. uid(field_xxxxx.uuid, field_xxxxx.name).

Field IDs can be obtained from GET /openapi/v2/project/searchIssueFields. The older GET /openapi/v2/project/issueFields list is not complete.

Common Virtual Fields (v$ prefix)

FieldDescriptionDeferred
v$pathReturns hierarchy path, equals own UUID when hierarchy not enabledNo
v$sub_workitem_countCurrent node's downstream countNo
v$list_pin_fieldList pin informationNo
v$progress_editableWhether progress is editableNo
v$has_view_manhour_tabWhether to show manhour tabNo
v$sub_workitem_done_countDownstream completed count, depends on v$pathYes
v$issue_pathSingle work item complete path (including parent info)No

OpenAPI Example

select
uid(uuid, uuid as path, field001 as summary,
field007.uuid, field007.name,
field005.name, field005.category,
v$list_pin_field as list_pin_field,
v$has_view_manhour_tab as has_manhour_tab,
v$sub_workitem_count as downstream_task_count,
v$sub_workitem_done_count as downstream_task_done_count)
from issue

where uid(3nfzBs64) in (uid('VU8KxHBr'))
and uid(field004) in (currentUser())
and v$cursor > ''
order by field009 desc

limit 1000, 50

Request​

Query Parameters

    teamID stringrequired

    The team ID

Body

    query string

    ONESQL query, supports parameterization

    variables

    object[]

    Parameterized variable value list

  • Array [

  • oneOf

    string

  • ]

  • hierarchy

    object

    Hierarchy relationship configuration

    lock_query string
    perspective boolean
    flat boolean

    path

    object

    upstream_field string
    downstream_field string

    config

    object

    field string
    tree string

Responses​

Request successful

Schema

    data

    object[]

    required

  • Array [

  • type Data type (string)

    item

    object

    Returned when data type is item, key is property identifier, value is property value

    object

    property name*

    IssuePropertyTypeSet

    anyOf

    uuid UUID (string)

    Possible values: >= 8 characters and <= 8 characters, Value must match regular expression ^[1-9A-HJ-NP-Za-km-z]{8}$

    team_uuid Team UUID (string)

    Possible values: >= 8 characters and <= 8 characters, Value must match regular expression ^[1-9A-HJ-NP-Za-km-z]{8}$

    type Attachment type (integer)
    name File name (string)
    description Description (string)
    status Status (integer)

    Possible values: [1, 2, 3, [object Object], [object Object], [object Object]]

    field_uuid Source property UUID (string)
    mime File MIME type (string)
    owner_uuid Uploader user UUID (string)

    Possible values: >= 8 characters and <= 8 characters, Value must match regular expression ^[1-9A-HJ-NP-Za-km-z]{8}$

    owner_name Uploader username (string)
    size File size (integer)
    create_time Upload time (integer)

    aggregate

    object

    Returned when data type is aggregate

    object

    group_aggregate

    object[]

    Returned when data type is group_aggregate

  • Array [

  • object
  • ]

  • group

    object

    Returned when data type is group

    key string
    total string

    info

    object

    nullable

    object
    property name* anynullable
  • ]

  • page_info

    object

    required

    has_next_page boolean

    Whether there is a next page

    start_cursor string

    Cursor of the first data item on current page

    end_cursor string

    Cursor of the last data item on current page

    page_count integer

    Number of items on current page

    total_count integer

    Total number of data items in result set, accurate number when less than N, N when greater than N

    start_pos integer

    Position index of the first data item on current page in result set

    end_pos integer

    Position index of the last data item on current page in result set

Loading...