跳到主要内容

Get space detail by space ID

GET 

/wiki/spaces/:spaceID

History​

VersionChanges
v6.2.16Added in: v6.2.16

Get space detail by space ID.

Request​

Path Parameters

    spaceID stringrequired

    The space ID

Query Parameters

    teamID stringrequired

    The team ID

    requestUserID string

    User ID, this parameter can only be passed when calling as an Oauth bot. It is used to perform operations as the specified user

Responses​

Request is successful.

Schema

    data

    object

    id string

    The space ID

    title string

    The space name

    description string

    The space description

    icon string

    The space icon identifier

    homePageID string

    The homepage ID

    createdTime integer

    The createdTime of space

    updatedTime integer

    The updatedTime of space

    creatorID string

    The creator ID

    isOpenPublic boolean

    Whether the space is allowed to share publicly

    isOpenShare boolean

    Whether the space is allowed to share internally

    isPin boolean

    Whether the space is pinned

    isOpenApproval boolean

    Whether approval is enabled for the space

    unapprovedPageVisibleScope integer

    Visibility scope for unapproved pages

    categoryID string

    The category ID

    result string

    The result of this request.

    errorCode string

    The error code of this request.

    errorMsg string

    Error message for this request.

    errorData object

    Error meta data for this request.

Loading...