跳到主要内容

Delete a space

DELETE 

/wiki/spaces/:spaceID

History​

VersionChanges
v7.21.0, v7.0.24, v6.100.35Added in: v7.21.0, v7.0.24, v6.100.35

Delete the space and invalidate its pages, drafts, sharing and publishing settings, project relationships, and permission rules. Repeating a successful deletion returns the standard resource-not-found business error.

Request​

Path Parameters

    spaceID stringrequired

    The space ID

Query Parameters

    teamID stringrequired

    The team ID

    requestUserID string

    User ID, this parameter can only be passed when calling as an Oauth bot. It is used to perform operations as the specified user

Responses​

Request is successful and returns the standard success response without data.

Schema

    result string
Loading...