跳到主要内容

Get a list of issue fields change log

GET 

/project/issueFields/changeLog

Get a list of issue fields change log

History​

VersionChanges
v6.0.57Added in: v6.0.57

Unsupported issue field type for query​

Issue field type
Time of appearance
Interval time
Frequency in status
Time in status
Issue No.

Unsupported system issue field for query​

Issue field ID
Creator
Time of creation
ID
Release progress
Working time progress
Deviation
Overall working time progress
Total Remaining Time
Total Logged Time
Total Estimated Time
Estimation Deviation

System issue field​

Issue field IDIssue field typeDescription
field001textTitle
field002textDescription
field004userAssigner
field005task_statusIssue status
field006projectProject
field007issue_typeIssue type
field008user_listWatcher
field010integerUpdated time
field011sprintSprint
field012optionPriority
field013dateDue date
field018floatTime estimated
field019floatTime spent
field020floatTime remaining
field021issue_typeSub issue type
field027datePlanned start date
field028datePlanned end date
field029productProduct(multi_option)
field030product_moduleProduct module(multi_option)
field031optionFound in production
field032floatStory point
field033floatProgress
field036dateRelease date
field038optionSeverity
field039optionResult
field040userSolver
field041optionBug type

System issue field type​

Issue field typeEnumTypeDescription
option1stringOption, the value is the currently selected option ID
text2stringText
integer3intInteger, value = actual value x 100000
float4intFloat, value = floor(actual value x 100000), 5 decimal places
date5intDate, UTC timestamp, in seconds
time6intTime, UTC timestamp, in seconds
sprint7stringSprint, the value is the sprint ID
user8stringTeam member, the value is the user ID
project9stringProject, the value is the project ID
task10stringWork item, the value is the work item ID
issue_type11stringIssue type, the value is the issue type ID
task_status12stringWork item status, the value is the work item status ID
user_list13arrayUser list, the values are user IDs
multi_line_text15stringMulti-line text
multi_option16arrayMultiple options, the values are the selected option IDs
publish_Version49arrayRelated releases, the values are release IDs
project_list50arrayMultiple projects, the values are project IDs
department52arrayMultiple departments, the values are department IDs

Request​

Query Parameters

    teamID stringrequired

    The team ID

    limit integer

    Possible values: <= 100

    Default value: 50

    The number returned by this request.The default value is 50, exceeding 100 will be truncated to 100

    cursor string

    The starting location of this request

    issueFieldID stringrequired

    The issue field ID.

    startTime integerrequired

    start time(format as timestamp in seconds),the maximum span between the start time and the end time must not exceed 1 day.

    endTime integerrequired

    end time(format as timestamp in seconds),the maximum span between the start time and the end time must not exceed 1 day.

    issueID string

    issue ID.

    projectID string

    project ID.

    operatorID string

    operator ID.

Responses​

Request is successful.

Schema

    result stringrequired

    The result of this request.

    errorCode string

    The error code of this request.

    errorMsg string

    Error message for this request.

    data

    object

    Data object containing a list of items and page information.

    list

    object[]

  • Array [

  • id string

    ID of the change log

    issueID string

    ID of the issue

    projectID string

    ID of the project

    operatorID string

    ID of the operator

    changeTime integer

    timestamp of the change

    changeOperation string

    operation of the change

    changeData object

    data of the change

  • ]

  • pageInfo

    object

    Page information.

    count integer

    The number returned this time.

    endCursor string

    The last cursor on this page is generally used to turn pages.

    hasNextPage boolean

    Is there a next page.

    startCursor string

    The first cursor on this page is generally used to turn pages.

    totalCount integer

    The total number of items available in the entire collection, including those that are returned in the current response.

Loading...