跳到主要内容

Get issue fields used in project detail forms

POST 

/project/issueFormFields

Get field metadata for fields used by issue detail forms in a project.

Notes​

  • project_uuid is required. Omit issue_type_uuids, or pass an empty array, to include all issue types in the project.
  • When issue_type_uuids is provided, only issue types belonging to the project are included. Invalid entries are ignored when at least one entry is valid; if none are valid, the existing not-found error is returned.
  • Fields from multiple detail forms are merged and deduplicated. Create forms, transition forms, hidden fields, and the issue number field are not included.
  • The response data is the field array itself. This API does not support keyword search or pagination and does not guarantee detail-form display order.
  • Field metadata has the same shape as items returned by GET /openapi/v2/project/searchIssueFields.

Request​

Query Parameters

    teamID stringrequired

    The team ID

Body

required

    project_uuid stringrequired

    Project UUID. The project must belong to the team specified by teamID.

    issue_type_uuids string[]

    Optional issue type UUIDs used to limit the detail-form scope.

Responses​

Request is successful.

Schema

    data

    object[]

    Issue field metadata without search or pagination wrappers.

  • Array [

  • id string

    Field ID.

    name string

    Field name.

    aliases string[]

    Field aliases.

    builtIn boolean

    Whether the field is built in.

    required boolean

    Whether the field is marked as required in the team field definition.

    createTime integer

    Field creation timestamp in seconds.

    description string

    Field description.

    fieldType string

    Flat field type identifier.

    fieldTypeName string

    Human-readable field type name.

    valueType string

    Internal field value type identifier.

    referenceObjectType string

    Referenced object type when the field stores reference values.

    readonly boolean

    Whether the field is read-only.

    canBeFilter boolean

    Whether the field can be used in filters.

    canBeSort boolean

    Whether the field can be used in sorting.

    canBeGroup boolean

    Whether the field can be used in grouping.

    setting

    object

    nullable

    Field setting JSON. Null when the field has no setting.

    property name* anynullable

    Field setting JSON. Null when the field has no setting.

  • ]

  • result stringrequired

    The result of this request.

    errorCode string

    The error code of this request.

    errorMsg string

    Error message for this request.

    errorData object

    Error meta data for this request.

Loading...