跳到主要内容

Search the complete issue field catalog

GET 

/project/searchIssueFields

Get the complete searchable issue field catalog for the current team, including newer field types introduced in 6.88+.

History​

VersionChanges
v6.100.30, v7.0.17, v7.13.0Added in: v6.100.30, v7.0.17, v7.13.0

Notes​

  • Returns static field metadata only.
  • This API does not return options, defaultValue, or a nested type object.
  • keyword filters by field name only. Empty keyword behaves the same as omitting it.
  • To fetch candidate values for option or reference fields, use GET /openapi/v3alpha/field/options or GET /openapi/v3alpha/field/plugin-options.

Request​

Query Parameters

    teamID stringrequired

    The team ID

    limit integer

    Possible values: >= 1 and <= 500

    Default value: 500

    Number of results to return. Defaults to 500. Maximum 500.

    cursor string

    The starting location of this request

    keyword string

    Optional keyword used to match field names.

Responses​

Request is successful.

Schema

    data

    object

    list

    object[]

    List of issue fields.

  • Array [

  • id string

    Field ID.

    name string

    Field name.

    aliases string[]

    Field aliases.

    builtIn boolean

    Whether the field is built in.

    required boolean

    Whether the field is marked as required in the team field definition.

    createTime integer

    Field creation timestamp in seconds.

    description string

    Field description.

    fieldType string

    Flat field type identifier.

    fieldTypeName string

    Human-readable field type name.

    valueType string

    Internal field value type identifier.

    referenceObjectType string

    Referenced object type when the field stores reference values.

    readonly boolean

    Whether the field is read-only.

    canBeFilter boolean

    Whether the field can be used in filters.

    canBeSort boolean

    Whether the field can be used in sorting.

    canBeGroup boolean

    Whether the field can be used in grouping.

    setting

    object

    nullable

    Field setting JSON. Null when the field has no setting.

    property name* anynullable

    Field setting JSON. Null when the field has no setting.

  • ]

  • pageInfo

    object

    Page information.

    count integer

    The number returned this time.

    endCursor string

    The last cursor on this page is generally used to turn pages.

    hasNextPage boolean

    Is there a next page.

    startCursor string

    The first cursor on this page is generally used to turn pages.

    totalCount integer

    The total number of items available in the entire collection, including those that are returned in the current response.

    result stringrequired

    The result of this request.

    errorCode string

    The error code of this request.

    errorMsg string

    Error message for this request.

    errorData object

    Error meta data for this request.

Loading...